The heritage-listed <strong>Como</strong> rail bridge that extends across the Georges River is to the north <strong>of</strong> the<br />

proposed site and has been converted to a pedestrian and bike path, connecting Oatley to<br />

<strong>Como</strong>.<br />

The site within the Sutherland Local Government Area (LGA) and the proposed work will be<br />

undertaken on land in the Zone 21 – Railway area.<br />

Land around the site is used for the purposes listed below.<br />

• To the north is the rail corridor, the heritage-listed <strong>Como</strong> rail bridge (which has now been<br />

converted to a pedestrian/bike path) and the Georges River.<br />

• To the east is the <strong>Como</strong> Marina and Scylla Bay.<br />

• To the south-east the railway plateau, covered with a bank <strong>of</strong> trees, falls steeply towards<br />

the pedestrian/bike path, the <strong>Como</strong> Marina and associated businesses, the <strong>Como</strong> Pleasure<br />

Grounds and <strong>Como</strong> swimming complex.<br />

• To the south is a substation, Scylla Bay Reserve and a number <strong>of</strong> residential dwellings<br />

along Cremona Road. The nearest residential receivers are approximately 240 metres from<br />

the proposed site.<br />

• To the south-west are residential dwellings on <strong>Como</strong> Parade and Central Parade, the<br />

nearest residential receivers are approximately 100 metres away.<br />

• To the west are the rail corridor and the Georges River.<br />

Access to the site is <strong>of</strong>f Cremona Road through the existing railway gate which is opposite the<br />

entrance to <strong>Como</strong> Marina. The gate is suitable for construction vehicle access.<br />

The climate in the area is similar to other parts <strong>of</strong> the Sydney Basin. The area experiences<br />

extremes <strong>of</strong> climate, having a peak monthly precipitation <strong>of</strong> 114.2 millimetres in February and<br />

the lowest rainfall in September with an average <strong>of</strong> 52.5 millimetres. The majority <strong>of</strong> the annual<br />

rainfall occurs in the summer months. The area experiences daily average temperatures varying<br />

from 12.3 to 21.4 degrees.<br />

The vegetation communities around the Georges River are primarily influenced by the<br />

distribution <strong>of</strong> shale (Cumberland Plain) and sandstone (Woronora Plateau) geologies and<br />

dominated by banksias, eucalyptus trees and several wattle species. RailCorp’s vegetation<br />

maps indicate a bush regeneration area in the vicinity <strong>of</strong> the BTS site.<br />

The immediate surrounding area drains into the Georges River. The site is approximately seven<br />

kilometres from Towra Point Nature Reserve, which is a registered Ramsar site and a wetland<br />

<strong>of</strong> international importance.<br />

The proposed site is also is in close proximity to a number <strong>of</strong> heritage items. The <strong>Como</strong> rail<br />

bridge is listed on the Register <strong>of</strong> the National Estate, State Heritage Register, RailCorp’s<br />

Section 170 Heritage and Conservation Register and the Sutherland Local <strong>Environmental</strong> Plan<br />

(LEP). The <strong>Como</strong> Pleasure Grounds and the <strong>Como</strong> Riviera C<strong>of</strong>fee Lounge (formerly Café de