contamination in the vicinity <strong>of</strong> the site. No waste dumping, soil discoloration, odours and/or<br />

similar were noticed.<br />

RailCorp does not have any record or evidence that the site may be contaminated. There are no<br />

contaminated sites in the suburb <strong>of</strong> <strong>Como</strong> listed on the NSW register.<br />

Hazardous materials will not be used during construction and operation and, therefore, the<br />

proposed work will not result in any new site contamination.<br />

Possible Control Measures<br />

It is highly unlikely that the site can be contaminated by known activities or by contaminants<br />

migrating from the known contaminated sites.<br />

However, the limited investigation cannot exclude potential contamination as the result <strong>of</strong><br />

unknown past activities, either on the site or in the vicinity. There is a risk that contaminants<br />

could be encountered during the proposed work. If encountered, contaminants may pose a risk<br />

to the health <strong>of</strong> workers and the environment in general.<br />

Risk Management and Possible Controls<br />

The risk <strong>of</strong> encountering unknown contaminants during excavation will be managed in<br />

accordance with RailCorp procedures, the <strong>Environmental</strong> Management Plan for DTRS project<br />

and land contamination legislation.<br />

The impact <strong>of</strong> potential contaminants will be minimised through a range <strong>of</strong> control measures<br />

including, but not limited to, those outlined below.<br />

• During excavation, site workers will look for signs <strong>of</strong> potential contamination such as the<br />

presence <strong>of</strong> waste and/or other imported materials, odours, soil colouring, floating<br />

layers in groundwater etc.<br />

• If any contamination is encountered or suspected, work will stop immediately and the<br />

site will be fenced <strong>of</strong>f.<br />

• Any potential contamination will be investigated and work resumed only when approved<br />

by the <strong>Site</strong> Supervisor.<br />

• A remedial action plan will be prepared before clean up operations begin.<br />

• The site will be validated before work begins.<br />

• Contaminated soil will be segregated in a special container before classification and<br />

disposal.<br />

The CEMP will further detail the proposed control measures.