4.17 Demand on Resources<br />

Construction materials are readily available and will be sourced from local contractors where<br />

possible.<br />

4.18 Cumulative <strong>Environmental</strong> Effects<br />

Cumulative impacts can result when several different construction projects are scheduled for<br />

similar times and locations.<br />

A search <strong>of</strong> the Department <strong>of</strong> Planning’s Major Projects register did not identify major projects<br />

in the vicinity <strong>of</strong> the proposed site. Similarly, a search <strong>of</strong> major development applications around<br />

the proposed area did not identify any large projects in the vicinity <strong>of</strong> the proposal and which<br />

might be constructed at a similar time.<br />

There is also a risk <strong>of</strong> cumulative impacts if unscheduled work, e.g. emergency work by other<br />

utilities or developers, is required. Such situations will be monitored and addressed by the<br />

Project Manager.<br />

The <strong>Como</strong> BTS site is one <strong>of</strong> a large number <strong>of</strong> radio communications facilities being installed<br />

across the RailCorp network as part <strong>of</strong> the DTRS project. In terms <strong>of</strong> localised cumulative<br />

construction impacts, the nearest proposal for the DTRS Project is the Oatley site, which is<br />

located approximately 1.8 kilometres north-east <strong>of</strong> the proposed site. Even if both facilities were<br />

constructed simultaneously, it is not likely to result in cumulative noise or local traffic impacts.<br />

Proposed Control Measures<br />

• Any other major development or works planned in the vicinity <strong>of</strong> the proposal will be<br />

investigated before work begins.<br />

• Sutherland Shire Council and any other relevant stakeholders will be consulted regarding<br />

other developments will be undertaken on an ongoing basis.<br />

4.19 Consideration <strong>of</strong> Clause 228 <strong>of</strong> EP&A Regulations and EPBC Act<br />

Clause 228 Factors<br />

Clause 228(2) <strong>of</strong> the EP&A Regulation 2000 details factors that must be taken into account<br />

when considering the likely impact <strong>of</strong> an activity on the environment. Table 3 provides a<br />

summary <strong>of</strong> how each <strong>of</strong> these factors has been considered.