ESD Principle<br />

Intergenerational equity<br />

Conservation <strong>of</strong><br />

biological diversity and<br />

ecological integrity<br />

Application to the proposal<br />

This proposal and the overarching DTRS project will contribute<br />

towards RailCorp’s strategic benefits for current and future<br />

generations, including safer public transport by improving on the<br />

current communications system, providing coverage and reliable<br />

communications services to all parts <strong>of</strong> the electrified rail corridor<br />

and acting as the basis for the introduction <strong>of</strong> an Automatic <strong>Train</strong><br />

Protection <strong>System</strong>.<br />

The economic, social and safety considerations <strong>of</strong> the DTRS have<br />

been integrated with the consideration and assessment <strong>of</strong><br />

potential environmental impacts regarding the development and<br />

operation <strong>of</strong> the DTRS.<br />

The proposed site is on disturbed land that has been previously<br />

cleared. The proposed activity is not expected to result in any loss<br />

<strong>of</strong> biodiversity or ecological integrity.<br />

Improved valuation and<br />

pricing <strong>of</strong> environmental<br />

resources<br />

RailCorp recognises the value <strong>of</strong> environmental sustainability and<br />

will minimise the impacts <strong>of</strong> its activities by ensuring that<br />

appropriate mitigation measures are implemented for all aspects <strong>of</strong><br />

the DTRS project. The potential environmental costs <strong>of</strong> the<br />

proposal have been considered in conjunction with the costs <strong>of</strong><br />

design, construction and operation.<br />

2.8 Other Guidelines<br />

Consideration <strong>of</strong> the NSW Telecommunication Facilities Guideline including Broadband NSW<br />

(DoP 2010) is a requirement when Clause 114 or Clause 115 (development <strong>of</strong> a<br />

telecommunications facility) <strong>of</strong> the ISEPP is applied. While the provisions <strong>of</strong> Clause 114 and<br />

Clause 115 do not apply to the proposal, the guidelines have been considered and are included<br />

at Appendix 1.<br />

2.9 Licences and Approvals<br />

Responsible Authority<br />

Approval/Licence/Permit<br />

RailCorp<br />

Determination under Part 5 <strong>of</strong> the <strong>Environmental</strong> Planning<br />

and Assessment Act 1979