<strong>Interim</strong> Report, No 3, 19 <strong>September</strong> <strong>2011</strong> – 18 <strong>March</strong> 2012<br />
The workshop <strong>report</strong> is under preparation and will be submitted with the next <strong>Interim</strong> Report.<br />
Planned activities for the next interim <strong>report</strong>ing period<br />
• Preparation and delivery of 5 th regional workshop Role of National and International<br />
Financing Sources in Environmental Financing. Programmes of Measures in Accordance<br />
with the WFD. The workshop will be <strong>org</strong>anised as joint event with the regional workshop<br />
under Investment Planning Sub-group in Montenegro (21-23 May 2012).<br />
Activity 3.3 EIA/SEA Sub-group<br />
Implemented activities during the third interim <strong>report</strong>ing period<br />
• Delivery of the 2 nd Annual Meeting of WG 3 EIA/SEA Sub-group Coordinators.<br />
The meeting was <strong>org</strong>anised in Dubrovnik, Croatia (10 November <strong>2011</strong>). The main objective of the<br />
meeting was to present the implemented activities since the 1 st Annual Meeting and to reach the<br />
agreement on the planned activities in the upcoming period (confirmation of the selected topics,<br />
dates and venues).<br />
• Preparation and delivery of the second training workshop on SEA and IPA programmes. The<br />
workshop was held in Dubrovnik, Croatia (08 – 09 November <strong>2011</strong>).<br />
During the first regional workshop on EIA/SEA held in June <strong>2011</strong> in Istanbul, Turkey, the<br />
participants suggested that another topic "SEA for IPA programmes", as quite urgent for RENA<br />
countries, should be covered by RENA training in the nearest future. Thus the additional training<br />
was <strong>org</strong>anised. It was focused on SEA practical application for IPA programmes considering their<br />
specifics. Participants went through all steps and analyses, to be usually performed in SEA and<br />
which are in line with the approach promoted by the Handbook on SEA for Cohesion Policy 2007<br />
- 2013.<br />
For more details please see the enclosed workshop <strong>report</strong> (Annex 18).<br />
Planned activities for the next interim <strong>report</strong>ing period<br />
• Preparation and delivery of the third training workshop on EIA/SEA differences and<br />
common features in Mostar, Bosnia and Herzegovina (24 – 26 April 2012).<br />
Activity 3.4 Multilateral Environmental Agreements<br />
Implemented activities during the second interim <strong>report</strong>ing period<br />
• In line with the decision made during the 2 nd Annual meeting of WG 1 Coordinators ( 24<br />
November, 2012, Brussels, Belgium), this activity has been merged with the activity 1.6 Gap<br />
assessment and compliance check of the draft Legislation with the EU environmental acquis<br />
and Multilateral Environmental Agreements.<br />
• Compliance check review of Chapter IX Import and Expert of Waste (Art. 48-51) of the<br />
final Albanian Law No. 10 463 of 22.09.<strong>2011</strong> on INTEGRATED WASTE<br />
MANAGEMENT, comparing the transposition with the requirements of the EU Waste<br />
Directive and the Basel Convention.<br />
Planned activities for the next interim <strong>report</strong>ing period<br />
• Upon request, compliance checks on the draft legislation of the beneficiary countries with the<br />
EU environmental acquis and Multilateral Environmental Agreements.<br />