<strong>Interim</strong> Report, No 3, 19 <strong>September</strong> <strong>2011</strong> – 18 <strong>March</strong> 2012<br />
• WG 4: Environmental Compliance and<br />
Enforcement Network for Accession (ECENA):<br />
Improved ability of ECENA member countries to<br />
implement and enforce the EU environmental<br />
legislation by increasing effectiveness of inspecting<br />
bodies and promoting compliance with<br />
environmental requirements<br />
EIA/SEA differences and common<br />
features; SEA cross-border procedures,<br />
including consultation and interpretation of<br />
cross-border impacts; EIA cross-border<br />
procedures, including consultation and<br />
interpretation of cross-border impacts. Pilot<br />
sites: Operational Programmes; four HPPs<br />
on Moraca river , Neretva/Trebisnjica river<br />
basin management with focus on upper<br />
horizon; Motorway Morinë – Merdar..<br />
• Gaps assessment Mutlilateral environmental<br />
agreements: Implementation questionnaires<br />
(IQs) prepared for selected MEAs;<br />
Maximum 12 implementation<br />
questionnaires completed and assessed;<br />
Maximum 12 MEA implementation <strong>report</strong>s<br />
completed<br />
• Capacity building permit writers and<br />
inspectors Before 3/2013: Two Training<br />
Topics assessments; Eight national training<br />
workshops ; Training Materials and<br />
Manuals; Pool of 20 well trained<br />
environmental inspectors and permits<br />
writers per country, capable of performing<br />
their tasks of implementing and enforcing<br />
the environmental acquis<br />
• Common inspections and site visits: eight<br />
national training workshops selected pilot<br />
sites will be visited and inspected with<br />
inspectors from other countries<br />
• Country external assessments: Seven<br />
country assessment <strong>report</strong>s with<br />
assessments of national, regional and local<br />
environmental capacity covering the whole<br />
management cycle of policy, legislation,<br />
permitting, verification and control,<br />
further requirements <strong>report</strong><br />
Gaps assessment multilateral agreements<br />
• Maximum 12 MEA implementation<br />
<strong>report</strong>s completed<br />
• Two regional Training Topics<br />
assessment <strong>report</strong>s<br />
• Eight national training <strong>report</strong>s on<br />
permitting and inspection with training<br />
manuals and common inspections<br />
• Preparatory Report Country<br />
Assessments<br />
• Seven RENA Country Assessment<br />
Reports<br />
• EU-ETS Regional Workshop Report<br />
• Two TFS Regional Workshop Reports<br />
• Two Cross border nature protection<br />
inspection Workshop Reports<br />
• Reports participants of ECENA sister<br />
networks<br />
Human Dynamics Consortium 6