05.02.2015 Views

3rd Interim report September 2011- March 2012.pdf - Renanetwork.org

3rd Interim report September 2011- March 2012.pdf - Renanetwork.org

3rd Interim report September 2011- March 2012.pdf - Renanetwork.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Interim</strong> Report, No 3, 19 <strong>September</strong> <strong>2011</strong> – 18 <strong>March</strong> 2012<br />

• WG 4: Environmental Compliance and<br />

Enforcement Network for Accession (ECENA):<br />

Improved ability of ECENA member countries to<br />

implement and enforce the EU environmental<br />

legislation by increasing effectiveness of inspecting<br />

bodies and promoting compliance with<br />

environmental requirements<br />

EIA/SEA differences and common<br />

features; SEA cross-border procedures,<br />

including consultation and interpretation of<br />

cross-border impacts; EIA cross-border<br />

procedures, including consultation and<br />

interpretation of cross-border impacts. Pilot<br />

sites: Operational Programmes; four HPPs<br />

on Moraca river , Neretva/Trebisnjica river<br />

basin management with focus on upper<br />

horizon; Motorway Morinë – Merdar..<br />

• Gaps assessment Mutlilateral environmental<br />

agreements: Implementation questionnaires<br />

(IQs) prepared for selected MEAs;<br />

Maximum 12 implementation<br />

questionnaires completed and assessed;<br />

Maximum 12 MEA implementation <strong>report</strong>s<br />

completed<br />

• Capacity building permit writers and<br />

inspectors Before 3/2013: Two Training<br />

Topics assessments; Eight national training<br />

workshops ; Training Materials and<br />

Manuals; Pool of 20 well trained<br />

environmental inspectors and permits<br />

writers per country, capable of performing<br />

their tasks of implementing and enforcing<br />

the environmental acquis<br />

• Common inspections and site visits: eight<br />

national training workshops selected pilot<br />

sites will be visited and inspected with<br />

inspectors from other countries<br />

• Country external assessments: Seven<br />

country assessment <strong>report</strong>s with<br />

assessments of national, regional and local<br />

environmental capacity covering the whole<br />

management cycle of policy, legislation,<br />

permitting, verification and control,<br />

further requirements <strong>report</strong><br />

Gaps assessment multilateral agreements<br />

• Maximum 12 MEA implementation<br />

<strong>report</strong>s completed<br />

• Two regional Training Topics<br />

assessment <strong>report</strong>s<br />

• Eight national training <strong>report</strong>s on<br />

permitting and inspection with training<br />

manuals and common inspections<br />

• Preparatory Report Country<br />

Assessments<br />

• Seven RENA Country Assessment<br />

Reports<br />

• EU-ETS Regional Workshop Report<br />

• Two TFS Regional Workshop Reports<br />

• Two Cross border nature protection<br />

inspection Workshop Reports<br />

• Reports participants of ECENA sister<br />

networks<br />

Human Dynamics Consortium 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!