3rd Interim report September 2011- March 2012.pdf - Renanetwork.org
3rd Interim report September 2011- March 2012.pdf - Renanetwork.org
3rd Interim report September 2011- March 2012.pdf - Renanetwork.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Interim</strong> Report, No 3, 19 <strong>September</strong> <strong>2011</strong> – 18 <strong>March</strong> 2012<br />
Activity 4.2<br />
Country external<br />
assessments<br />
II)<br />
Detailed topics definition with<br />
focus on the general package<br />
and the 2nd batch of 4<br />
countries (Serbia, fYR of<br />
Macedonia, Montenegro and<br />
Croatia)<br />
Manual and materials<br />
development for 2nd batch of<br />
training workshops<br />
5th national training<br />
workshop on selected subjects<br />
Cluster I for Serbia, with<br />
common inspections (Cluster<br />
II)<br />
6th national training<br />
workshop on selected subjects<br />
Cluster I for fYR of<br />
Macedonia, with common<br />
inspections (Cluster II)<br />
7th national training<br />
workshop on selected subjects<br />
Cluster I for Montenegro with<br />
common inspections (Cluster<br />
II)<br />
8th national training<br />
workshop on selected subjects<br />
Cluster I Croatia with<br />
common inspections (Cluster<br />
II)<br />
9/<strong>2011</strong> –<br />
11/<strong>2011</strong><br />
11/<strong>2011</strong> –<br />
2/2012<br />
27-30/3/2012<br />
24-27/4/2012<br />
9/2012<br />
11/2012<br />
Needs assessment<br />
<strong>report</strong> 2<br />
Manual and materials<br />
2nd batch of National<br />
trainings<br />
Workshop <strong>report</strong> and<br />
<strong>report</strong> on training 5<br />
Workshop <strong>report</strong> and<br />
<strong>report</strong> on training 6<br />
Workshop <strong>report</strong> and<br />
<strong>report</strong> on training 7<br />
Workshop <strong>report</strong> and<br />
<strong>report</strong> on training 8<br />
12/<strong>2011</strong><br />
2/2012<br />
Task Period Planned milestone Milestone<br />
reached<br />
Preparation and desk study of<br />
existing documents and 3/<strong>2011</strong> Preparatory <strong>report</strong> 4-5/<strong>2011</strong><br />
<strong>report</strong>s for Serbia<br />
Fact-finding mission Serbia 4/<strong>2011</strong> List of findings 5/<strong>2011</strong><br />
Preparation of the countryspecific<br />
<strong>report</strong> for Serbia<br />
<strong>report</strong> for Serbia<br />
Country assessment<br />
5/<strong>2011</strong><br />
7/<strong>2011</strong><br />
Preparation and desk study of<br />
existing documents and 4/<strong>2011</strong> Preparatory <strong>report</strong> 5-6/<strong>2011</strong><br />
<strong>report</strong>s for fYR of Macedonia<br />
Fact finding mission fYR of<br />
5/<strong>2011</strong> List of findings 5/<strong>2011</strong><br />
Macedonia<br />
Preparation of the country<br />
specific <strong>report</strong> for fYR of<br />
Macedonia<br />
Preparation and desk study of<br />
existing documents and<br />
<strong>report</strong>s for Montenegro<br />
Fact-finding mission<br />
Montenegro<br />
Preparation of the countryspecific<br />
<strong>report</strong> for<br />
Montenegro<br />
Preparation and desk study of<br />
existing documents and<br />
<strong>report</strong>s for Albania<br />
6/<strong>2011</strong><br />
Country assessment<br />
<strong>report</strong> for fYR of<br />
Macedonia<br />
7/<strong>2011</strong><br />
4/<strong>2011</strong> Preparatory <strong>report</strong> 6-7/<strong>2011</strong><br />
5/<strong>2011</strong> List of findings 8/<strong>2011</strong><br />
6/<strong>2011</strong><br />
Country assessment<br />
<strong>report</strong> for<br />
Montenegro<br />
8/<strong>2011</strong><br />
9/<strong>2011</strong> Preparatory <strong>report</strong> 9/<strong>2011</strong><br />
Human Dynamics Consortium 48