5.13 Prefabrication/ Preassembly/ Modularization<br />
1. To what extent did the project team consider prefabrication, preassembly or modularization?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
2. To what extent did the project team consider the cost impact <strong>of</strong> using prefabrication,<br />
preassembly or modularization?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
3. To what extent were labor availability and labor cost considered in evaluation <strong>of</strong> using<br />
prefabrication, preassembly or modularization?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
4. To what extent were shipping routes and options considered in the prefabrication,<br />
preassembly or modularization decision?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
5. To what extent were safety and quality issues considered in the prefabrication, preassembly or<br />
modularization decision?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
6. To what extend was the construction schedule considered in the prefabrication, preassembly<br />
or modularization decision?<br />
Not at all Fully NA UNK<br />
0 1 2 3 4 ◘ ◘<br />
Please evaluate the overall effectiveness for each practice you used in this project.<br />
Respond with NA if you did not use a best practice.<br />
Prefabrication/ Preassemble/ Modularization Effectiveness<br />
On a scale <strong>of</strong> 0 to 10, with 0 indicating not effective and 10 indicating very effective, please<br />
assess the overall effectiveness <strong>of</strong> the Prefabrication/ Preassembly/ Modularization on this<br />
project.<br />
0 1 2 3 4 5 6 7 8 9 10 NA UNK<br />
◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />