18.06.2015 Views

Contractors' Questionnaire - Construction Owners Association of ...

Contractors' Questionnaire - Construction Owners Association of ...

Contractors' Questionnaire - Construction Owners Association of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cable Tray<br />

None<br />

IFC<br />

Quantity<br />

(LM)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Cable Tray<br />

This includes electrical and instrument cable trays, channels, supports, covers, etc.<br />

Wire & Cable<br />

None<br />

LM<br />

Wire & Cable<br />

(w/o conduit or tray) Number <strong>of</strong><br />

Terminations<br />

This includes power, control and grounding cables.<br />

IFC<br />

Quantity<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Other Electrical<br />

Lighting Fixtures (each)<br />

None<br />

IFC<br />

Quantity<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

This includes fixtures, conduit, wiring, panels, and control devices. Quantity is the number <strong>of</strong><br />

fixtures.<br />

Electrical Heat Tracing (LM)<br />

This includes electric heat trace cable, power feeds to the cable, control accessories, end <strong>of</strong><br />

line devices, connectors, tape or other strapping/support materials, and any other items needed<br />

to complete the heat trace system. Length is based on the lineal meter <strong>of</strong> process and utility<br />

piping heat traced.<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!