1. Excellent - Highly skilled and experienced members with authority; representation from<br />
business, project management, technical disciplines, and operations; able to respond to<br />
both business and project objectives.<br />
2. Poor - Members with a poor combination <strong>of</strong> skill or experience that lack authority;<br />
insufficient representation from business, project management, technical disciplines, and<br />
operations; unable to respond to both business and project objectives.<br />
Select a number below that best describes the technology evaluation performed for this<br />
project during Front End Planning.<br />
Poor Average Excellent<br />
◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />
1 2 3 4 5 6 7 8 9 10<br />
1. Excellent - Thorough and detailed identification and analysis <strong>of</strong> existing and emerging<br />
technologies for feasibility and compatibility with corporate business and operations<br />
objectives. Scale-up problems and hands-on process experience were considered.<br />
2. Poor - Poor or no technology evaluation.<br />
Select a number below that best describes the evaluation <strong>of</strong> alternate siting locations.<br />
Poor Average Excellent<br />
◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />
1 2 3 4 5 6 7 8 9 10<br />
• Excellent - Thorough and detailed assessment <strong>of</strong> relative strengths and weaknesses <strong>of</strong><br />
alternate locations to meet owner requirements.<br />
• Poor - Poor or no evaluation <strong>of</strong> alternate siting locations.<br />
Select a number below that best describes the risk analysis performed for project alternatives.<br />
Poor Average Excellent<br />
◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />
1 2 3 4 5 6 7 8 9 10<br />
1. Excellent - Risks associated with the selected project alternatives were identified and<br />
analyzed. These analyses included financial/business, regulatory, project and operational<br />
risk categories in order to minimize the impacts <strong>of</strong> risks on project success.<br />
2. Poor - Poor or no risk analysis performed for project alternatives.<br />
59