2.4 Field Rework<br />

Was there a system for tracking and evaluating field rework for this project?<br />

◘Yes ◘No ◘Unknown<br />

If Yes:<br />

1. Please indicate the Direct Cost and Schedule Impact <strong>of</strong> Field Rework for each<br />

source shown below. The direct cost <strong>of</strong> field rework relates to all costs needed<br />

to perform the rework itself.<br />

2. If there was no direct cost <strong>of</strong> field rework for a category, please enter “0”.<br />

3. If you cannot provide the requested information by source, but can provide<br />

the total for the project, please click unknown in the source fields and enter the<br />

project total. This will override the totaling function. As long as you don’t click<br />

back into a phase field, your total will be accepted and recorded.<br />

4. All costs should be recorded using Canadian Dollars (CAD).<br />

.<br />

Source <strong>of</strong> Field<br />

Rework<br />

Design<br />

Vendor<br />

Owner<br />

Contractor<br />

Other<br />

Total<br />

$<br />

Direct Cost<br />

<strong>of</strong> Field Rework<br />

◘Unknown<br />

$<br />

◘Unknown<br />

$<br />

◘Unknown<br />

$<br />

◘Unknown<br />

$<br />

◘Unknown<br />

$<br />

Schedule Impact <strong>of</strong><br />

Field Rework<br />

(weeks)<br />

◘Unknown<br />

◘Unknown<br />

◘Unknown<br />

◘Unknown<br />

◘Unknown<br />

16