Contractors' Questionnaire - Construction Owners Association of ...
Contractors' Questionnaire - Construction Owners Association of ...
Contractors' Questionnaire - Construction Owners Association of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.5 Design for Maintainability<br />
Design for maintainability is the optimum use <strong>of</strong> facility maintenance knowledge and experience<br />
in the design/engineering <strong>of</strong> a facility.<br />
For each question select the single most appropriate response.<br />
1. How well were corporate maintainability strategies and standards communicated on this<br />
project?<br />
Not at all<br />
Fully<br />
0 1 2 3 4 NA / UNK<br />
◘ ◘ ◘ ◘ ◘ ◘<br />
1. Was a designated maintainability person integrated into the project team?<br />
Not at all<br />
Fully<br />
0 1 2 3 4 NA / UNK<br />
◘ ◘ ◘ ◘ ◘ ◘<br />
2. To what extent were your organization’s maintainability standards used in the project design?<br />
Not at all<br />
Fully<br />
0 1 2 3 4 NA / UNK<br />
◘ ◘ ◘ ◘ ◘ ◘<br />
3. Were formal maintainability review sessions held with your facility maintenance<br />
organization?<br />
Not at all<br />
Sometimes<br />
As<br />
Appropriate<br />
0 1 2 3 4 NA / UNK<br />
◘ ◘ ◘ ◘ ◘ ◘<br />
5. Was a life cycle cost analysis tool used to determine equipment needs for the project?<br />
No Sometimes Always<br />
0 1 2 3 4 NA / UNK<br />
◘ ◘ ◘ ◘ ◘ ◘<br />
77