3.5 Instrumentation<br />
Instructions<br />
Please complete the following tables indicating quantity and engineering work-hours for the<br />
categories appropriate to your project. If you cannot enter all data then enter totals only. Include<br />
rework in the work-hours only. If the project had no work-hours or quantities for a category,<br />
enter none.<br />
The quantity <strong>of</strong> instrumentation is the amount provided in the final Issued for <strong>Construction</strong> (IFC)<br />
drawings.<br />
Refer to the section “Instructions for Computation <strong>of</strong> Work-Hours and Rework-Hours” for an<br />
additional detailed listing <strong>of</strong> direct hours to be included and indirect hours that are to be excluded<br />
from the computation <strong>of</strong> the work-hours.<br />
Which design platform was used for this category in this project? Check all that apply.<br />
2D ( )<br />
3D ( )<br />
Instrumentation<br />
None<br />
IFC<br />
Quantity<br />
Engineering WH<br />
(including rework)<br />
(hours)<br />
Loops (count)<br />
Tagged Devices (count)<br />
I/O (count)<br />
This includes all instrument and control design work-hours except DCS/PLC Configuration<br />
and Programming. I/O (count) includes the I/O that comes over digital communication<br />
interfaces from outside <strong>of</strong> the control system. For such interfaces, count the addressable points.<br />
For fieldbus interfaces, count only the devices.<br />
◘ DCS/PLC Design included<br />
DCS/PLC Configuration and<br />
Programming<br />