3.3 Electrical<br />

Instructions<br />

Please complete the following tables indicating quantity and engineering work-hours for the<br />

categories appropriate to your project. If you cannot enter all data then enter totals only. Include<br />

rework in the work-hours only. If the project had no work-hours or quantities for a category,<br />

enter none.<br />

• Total Direct Engineering Electrical Work-Hours for This Project _________<br />

• Total Connected Horsepower <strong>of</strong> Motors _________<br />

• Number <strong>of</strong> Motors _________<br />

• Total KVA Load <strong>of</strong> Project _________<br />

The quantity <strong>of</strong> electrical equipment, conduit, cable trays, wire, termination, and lighting fixtures<br />

are the amount <strong>of</strong> each provided in the final Issued for <strong>Construction</strong> (IFC) drawings.<br />

Refer to the section “Instructions for Computation <strong>of</strong> Work-Hours and Rework-Hours” for an<br />

additional detailed listing <strong>of</strong> direct hours to be included and indirect hours that are to be excluded<br />

from the computation <strong>of</strong> the work-hours.<br />

Which design platform was used for this category in this project? Check all that apply.<br />

2D ( )<br />

3D ( )<br />

Electrical Equipment<br />

Electrical Equipment 600V & Below<br />

None<br />

IFC<br />

Quantity<br />

(each)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Electrical Equipment Over 600V<br />

Electrical equipment includes transformers, switchgear, UPS systems, MCCs, rectifiers,<br />

motors, generators, etc. This also includes work-hours for single line, elementary diagrams<br />

and studies.<br />

Total<br />

Electrical Equipment<br />

Conduit<br />

None<br />

IFC<br />

Quantity<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

LM<br />

Conduit<br />

Number <strong>of</strong> Runs<br />

This includes power plan, cable and conduit schedule and interconnects. Exposed /<br />

aboveground and underground<br />

22