3.1 Concrete<br />
Instructions<br />
Please complete the following tables indicating quantity and engineering work-hours for the<br />
categories appropriate to your project. If you cannot enter all data then enter totals only. Include<br />
rework in the work-hours only. If the project had no work-hours or quantities for a category,<br />
enter none.<br />
The quantity <strong>of</strong> concrete is the amount <strong>of</strong> concrete that is required for the specified slab,<br />
foundation, or structure provided in the final Issued for <strong>Construction</strong> (IFC) drawings.<br />
Refer to the section “Instructions for Computation <strong>of</strong> Work-Hours and Rework-Hours” for a<br />
detailed listing <strong>of</strong> direct hours to be included and indirect hours that are to be excluded from the<br />
computation <strong>of</strong> the work-hours.<br />
Which design platform was used for this category in this project? Check all that apply.<br />
2D ( )<br />
3D ( )<br />
Slabs<br />
Ground & Supported Slabs<br />
Area Paving<br />
Total Slabs<br />
None<br />
IFC<br />
Quantity<br />
(CM)<br />
Engineering WH<br />
(including rework)<br />
(hours)<br />
Foundations<br />
Piling (each)<br />
Foundations (< 4CM)<br />
Foundations ( ≥4CM)<br />
Total Foundations (CM)<br />
(Excluding piling)<br />
None<br />
IFC<br />
Quantity<br />
(CM)<br />
Engineering WH<br />
(including rework)<br />
(hours)<br />
Concrete Structures<br />
None<br />
IFC<br />
Quantity<br />
(CM)<br />
Engineering WH<br />
(including rework)<br />
(hours)<br />
Concrete Structures<br />
Concrete Structures include concrete structures, columns, beams, cooling tower<br />
basins, trenches, formed elevated slabs/structures, and retaining walls.<br />
Total Concrete<br />
None<br />
IFC<br />
Quantity<br />
(CM)<br />
Engineering WH<br />
(including rework)<br />
(hours)<br />
Total Concrete<br />
18