3.1 Concrete<br />

Instructions<br />

Please complete the following tables indicating quantity and engineering work-hours for the<br />

categories appropriate to your project. If you cannot enter all data then enter totals only. Include<br />

rework in the work-hours only. If the project had no work-hours or quantities for a category,<br />

enter none.<br />

The quantity <strong>of</strong> concrete is the amount <strong>of</strong> concrete that is required for the specified slab,<br />

foundation, or structure provided in the final Issued for <strong>Construction</strong> (IFC) drawings.<br />

Refer to the section “Instructions for Computation <strong>of</strong> Work-Hours and Rework-Hours” for a<br />

detailed listing <strong>of</strong> direct hours to be included and indirect hours that are to be excluded from the<br />

computation <strong>of</strong> the work-hours.<br />

Which design platform was used for this category in this project? Check all that apply.<br />

2D ( )<br />

3D ( )<br />

Slabs<br />

Ground & Supported Slabs<br />

Area Paving<br />

Total Slabs<br />

None<br />

IFC<br />

Quantity<br />

(CM)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Foundations<br />

Piling (each)<br />

Foundations (< 4CM)<br />

Foundations ( ≥4CM)<br />

Total Foundations (CM)<br />

(Excluding piling)<br />

None<br />

IFC<br />

Quantity<br />

(CM)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Concrete Structures<br />

None<br />

IFC<br />

Quantity<br />

(CM)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Concrete Structures<br />

Concrete Structures include concrete structures, columns, beams, cooling tower<br />

basins, trenches, formed elevated slabs/structures, and retaining walls.<br />

Total Concrete<br />

None<br />

IFC<br />

Quantity<br />

(CM)<br />

Engineering WH<br />

(including rework)<br />

(hours)<br />

Total Concrete<br />