5.11 Automation/Integration (AI) Technology<br />

This section addresses the degree <strong>of</strong> automation/level <strong>of</strong> use and integration <strong>of</strong> automated<br />

systems for specific tasks/work functions common to most projects. Using the first matrix,<br />

please assess the degree <strong>of</strong> automation and level <strong>of</strong> use only. Using the second matrix, please<br />

assess the level <strong>of</strong> integration <strong>of</strong> these automated systems among the tasks/work functions.<br />

Referring to the use levels below, indicate how well for this project, the tasks/work functions<br />

were automated. Select the single most appropriate use level for the task/work functions listed.<br />

USE LEVELS<br />

• Level 1(None/Minimal): Little or no utilization beyond e-mail.<br />

• Level 2 (Some): “Office” equivalent s<strong>of</strong>tware, 2D CAD for detailed engineering.<br />

• Level 3 (Moderate): Standalone electronic/automated engineering discipline (3D CAD)<br />

and project services systems.<br />

• Level 4 (Nearly Full): Some automated input/output from multiple databases with<br />

automated engineering discipline design and project services systems.<br />

• Level 5 (Full): Fully or nearly fully automated systems dominate execution <strong>of</strong> all work<br />

functions.<br />

Automation <strong>of</strong> Task/Work Functions<br />

Use Level<br />

Task/Work Functions 1 2 3 4 5 NA UNK<br />

Business planning and analysis<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Conceptual definition & design<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Project (discipline) definition & facility design<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Supply management<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Project management<br />

Coordination system ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Communications system ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Cost system ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Schedule system ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Quality system ◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Off-site/pre-construction<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

<strong>Construction</strong><br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

As-built documentation<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

Facility start-up & life cycle support<br />

◘ ◘ ◘ ◘ ◘ ◘ ◘<br />

94