Total<br />
Concrete<br />
None<br />
Quantity<br />
(CM)<br />
Estimated Productivity<br />
WH<br />
Total Installed Unit<br />
Cost ($/CM)<br />
Total<br />
Concrete<br />
Total Installed Unit Cost (TIUC) for Total Concrete is the weighted average<br />
by quantity <strong>of</strong> the total slabs, total foundations, total concrete structures and<br />
any other concrete not included above.<br />
Total<br />
Concrete<br />
None<br />
Sub<br />
contracted<br />
(Yes or No)<br />
Actual Productivity<br />
Installed<br />
Quantity<br />
(CM)<br />
Actual WH<br />
(including rework)<br />
(hours)<br />
Total Installed<br />
Unit Cost<br />
($/CM)<br />
Total<br />
Concrete<br />
Total Installed Unit Cost (TIUC) for Total Concrete is the weighted average by quantity <strong>of</strong> the<br />
total slabs, total foundations, total concrete structures and any other concrete not included above.<br />
Concrete Repetitive <strong>Construction</strong><br />
If the project includes multiple similar components that allow construction efficiencies (i.e.<br />
based on learning curve, formwork reuse, etc.), estimate the percentage <strong>of</strong> the total quantity for<br />
concrete that was repeated.<br />
Example: The total concrete quantity for a project is 5,000 CM. The design includes three<br />
identical foundations <strong>of</strong> 1,000 CM each. There are no other identical components. The estimated<br />
repeated quantity for concrete is: 3(1,000)- 1,000 CM = 2000 CM = 40%<br />
5,000 CM 5,000 CM<br />
No Response<br />
< 10% ≥ 10% > 20% >30% > 40% >50% > 60% > 70% > 80% > 90%<br />