Contractors' Questionnaire - Construction Owners Association of ...

Contractors' Questionnaire - Construction Owners Association of ...

Contractors' Questionnaire - Construction Owners Association of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Instructions for calculation <strong>of</strong> Weighted-Average Diameter <strong>of</strong> Conduit (Hyperlink)<br />

Conduit<br />

Exposed or Aboveground Conduit<br />

Weighted<br />

Average<br />

Diameter<br />

(inches)<br />

None<br />

Estimated Productivity<br />

Quantity<br />

(LM)<br />

WH<br />

Total<br />

Installed<br />

Unit Cost<br />

($/LM)<br />

This includes all labour for installation <strong>of</strong> conduit, hangers, supports, fittings, flexible connections,<br />

marking, grounding jumpers, seals, boxes, etc.<br />

This excludes lighting conduit.<br />

Underground, Duct Bank or<br />

Embedded Conduit<br />

This includes all labour for installation <strong>of</strong> conduit, supports, grounding jumpers, etc. Does not<br />

include excavation, backfill, concrete, manholes, etc.<br />

Total Conduit<br />

- Total Installed Unit Cost (TIUC) for Conduit is the weighted average by quantity <strong>of</strong> Exposed<br />

or Aboveground Conduits, Underground, Duct Bank or Embedded Conduit.<br />

Conduit<br />

Weighted<br />

Average<br />

Diameter<br />

(mm.)<br />

None<br />

Sub<br />

Contracted<br />

(Yes or No)<br />

Actual Productivity<br />

Installed<br />

Quantity<br />

(LM)<br />

Actual WH<br />

(including rework)<br />

(hours)<br />

Total<br />

Installed<br />

Unit Cost<br />

($/LM)<br />

Exposed or<br />

Aboveground<br />

Conduit<br />

This includes all labour for installation <strong>of</strong> conduit, hangers, supports, fittings, flexible connections, marking,<br />

grounding jumpers, seals, boxes, etc.<br />

This excludes lighting conduit.<br />

Underground,<br />

Duct Bank or<br />

Embedded<br />

Conduit<br />

This includes all labour for installation <strong>of</strong> conduit, supports, grounding jumpers, etc.<br />

Does not include excavation, backfill, concrete, manholes, etc.<br />

Total Conduit<br />

- Total Installed Unit Cost (TIUC) for Conduit is the weighted average by quantity <strong>of</strong> Exposed or<br />

Aboveground Conduits, Underground, Duct Bank or Embedded Conduit.<br />

37