Before the Putting in Function<br />

PROCHLORE<br />

Responsabilities:<br />

Water & Canalisation Co.<br />

Before the counter<br />

counter<br />

water supply pipe<br />

Water & Canalisation Co.<br />

Using product:<br />

PROCHLORE. See page no. 9<br />

Necessary equipment:<br />

Dosing station. See page no. 7.<br />

Usage mode:<br />

Private pipe after the counter<br />

New pipes<br />

31<br />

Private pipe after the counter<br />

Functionating installation<br />

Responsabilities<br />

Owner Owner<br />

Construction site boss User<br />

Architect Architect<br />

valve water supply measurement at every tap<br />

equal dosing group<br />

1. Switch <strong>of</strong>f the unit.<br />

2. Connect the water supply to the dosing group<br />

3. Connect the drinking water supply at the <strong>pump</strong> outlet<br />

4. Programm the PROCHLORE dosage<br />

5. Open the water intake after the counter<br />

6. Open the taps one after another , measure the PROCHLORE dosis at each <strong>of</strong> them<br />

7. When the pipes are full <strong>of</strong> PROCHLORE at desired dosis, leave the product to react, time to react according to the<br />

table on technical data sheet .<br />

8. Switch <strong>of</strong>f the dosing group<br />

9. Connect the installation<br />

10. Open intake valve for rinsing<br />

11. Control by measuring PROCHLORE at each tap to see if it still exists.<br />

Observation: In case <strong>of</strong> the Legionella bacteria:<br />

- Before each disinfection treatment the installation must be cleaned (stone removal, Deoxidation)<br />

- See recommendations to the Legionella bacteria