Before the Putting in Function<br />
PROCHLORE<br />
Responsabilities:<br />
Water & Canalisation Co.<br />
Before the counter<br />
counter<br />
water supply pipe<br />
Water & Canalisation Co.<br />
Using product:<br />
PROCHLORE. See page no. 9<br />
Necessary equipment:<br />
Dosing station. See page no. 7.<br />
Usage mode:<br />
Private pipe after the counter<br />
New pipes<br />
31<br />
Private pipe after the counter<br />
Functionating installation<br />
Responsabilities<br />
Owner Owner<br />
Construction site boss User<br />
Architect Architect<br />
valve water supply measurement at every tap<br />
equal dosing group<br />
1. Switch <strong>of</strong>f the unit.<br />
2. Connect the water supply to the dosing group<br />
3. Connect the drinking water supply at the <strong>pump</strong> outlet<br />
4. Programm the PROCHLORE dosage<br />
5. Open the water intake after the counter<br />
6. Open the taps one after another , measure the PROCHLORE dosis at each <strong>of</strong> them<br />
7. When the pipes are full <strong>of</strong> PROCHLORE at desired dosis, leave the product to react, time to react according to the<br />
table on technical data sheet .<br />
8. Switch <strong>of</strong>f the dosing group<br />
9. Connect the installation<br />
10. Open intake valve for rinsing<br />
11. Control by measuring PROCHLORE at each tap to see if it still exists.<br />
Observation: In case <strong>of</strong> the Legionella bacteria:<br />
- Before each disinfection treatment the installation must be cleaned (stone removal, Deoxidation)<br />
- See recommendations to the Legionella bacteria