20.11.2012 Views

Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus

Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus

Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Shrink-<strong>on</strong> devices and protective<br />

tapes<br />

As an alternative to the cement mortar<br />

protecting sleeve, the joint regi<strong>on</strong> can<br />

also be protected with shrink-<strong>on</strong> devices<br />

or protective tapes. The shrink-<strong>on</strong> device<br />

must be suitable for the dimensi<strong>on</strong>s <strong>of</strong> the<br />

particular joint involved.<br />

Applying a shrink-<strong>on</strong> collar<br />

The shrink-<strong>on</strong> collar has to be pulled over<br />

the socket end before the joint is made.<br />

The surface to be enclosed has to be prepared<br />

in accordance with DVGW Merkblatt<br />

GW 1 , i.e. the regi<strong>on</strong> has to be<br />

freed <strong>of</strong> rust, grease, dirt and loose particles.<br />

The surface must be pre-heated to<br />

approx. 0°C with a propane gas flame set<br />

to a s<strong>of</strong>t setting and thus dried.<br />

The shrink-<strong>on</strong> collar is then pulled over the<br />

joint until it is central <strong>on</strong> it and the protective<br />

backing <strong>on</strong> the inside is then removed.<br />

At the point where the end-face <strong>of</strong> the<br />

socket is situated, the shrink-<strong>on</strong> collar is<br />

then heated evenly, all round, with a propane<br />

gas flame set to a s<strong>of</strong>t setting until<br />

the shrinking process begins and the sleeve<br />

starts to assume the outline shape <strong>of</strong> the<br />

socket. Then, while keeping the temperature<br />

even, which should be d<strong>on</strong>e by<br />

moving the burner in the circumferential<br />

directi<strong>on</strong> while fanning it from side to side,<br />

the part <strong>of</strong> the collar around the socket is<br />

first shrunk <strong>on</strong>, and then, starting from the<br />

end-face <strong>of</strong> the socket, the part around the<br />

main body <strong>of</strong> the pipe.<br />

~ 100<br />

ZMU<br />

123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!