the outlet nozzles. In rocky soils, drilling heads fitted with roller chisels can be used.<br />

The pilot bore is steered by c<strong>on</strong>trolled rotati<strong>on</strong> <strong>of</strong> the bevelled steering surface <strong>of</strong> the<br />

drilling head. This surface moves <strong>of</strong>f-line and it can be forced to move <strong>of</strong>f-line in the<br />

desired directi<strong>on</strong> by rotating it (Fig. . ).<br />

The actual positi<strong>on</strong> <strong>of</strong> the drilling head is detected above the path <strong>of</strong> the bore by means<br />

<strong>of</strong> radio signals from a transmitter housed in the drilling head. Any deviati<strong>on</strong>s from the<br />

desired line are corrected by appropriate steered movements. Today, the accuracy <strong>of</strong><br />

steering is so high that, after being driven for a length <strong>of</strong> more than 1000 metres, pilot<br />

bores can be made to arrive within a target area measuring <strong>on</strong>ly a square metre in size.<br />

Fig. 5.7<br />

The tool for the first stage <strong>of</strong> upsizing<br />

5.2.2 The upsized bore or bores<br />

A descripti<strong>on</strong> <strong>of</strong> the technique<br />

Fig. 5. 8<br />

The tool for the sec<strong>on</strong>d stage <strong>of</strong> upsizing<br />

If the pilot bore needs to be upsized, suitable tools are used to upsize it, in a number<br />

<strong>of</strong> stages, to a diameter suitable for the pulling-in <strong>of</strong> the medium-carrying pipe. For this<br />

purpose, an upsizing head is fitted to the pilot drilling linkage, the size and c<strong>on</strong>figurati<strong>on</strong><br />

<strong>of</strong> this head being governed by the particular soil c<strong>on</strong>diti<strong>on</strong>s and the size <strong>of</strong> the<br />

pipe which is subsequently going to be pulled in (Figs. .7 and .8). The upsizing head<br />

is pulled through the bore while rotating c<strong>on</strong>tinuously and in this way it enlarges the<br />

size <strong>of</strong> the pilot bore. The soil which is cut away is carried out with the drilling mud and<br />

this latter supports the bore at the same time. The upsizing process is repeated with<br />

increasingly large heads until the bore is <strong>of</strong> the desired inside diameter.<br />

7