The steered pilot bore technique<br />
In the third step <strong>of</strong> the operati<strong>on</strong>, the first DN 300 ductile cast ir<strong>on</strong> pipe for medium<br />
with BLS ® joints is lowered into the arrival pit (Fig. 8. ) and coupled to the tracti<strong>on</strong> head<br />
<strong>on</strong> the fr<strong>on</strong>t casing pipe. The casing pipes, which are c<strong>on</strong>nected by l<strong>on</strong>gitudinal force-fit<br />
joints, are now pulled back to the launch pit; there they are recovered together with<br />
the feed auger. It takes next to no time for all the other pipes for medium to be coupled<br />
<strong>on</strong>to the pipe that has already been pulled in (Figs. 8. and 8. ). The tracti<strong>on</strong> head carries<br />
equipment for measuring the tractive force; this is used to measure the pulling-in forces<br />
acting <strong>on</strong> the string <strong>of</strong> pipes and, later <strong>on</strong>, to document them in a print-out.<br />
Fig. 8.4 Step 3: Pulling-in <strong>of</strong> the pipes for medium<br />
88<br />
2. Pressing in the casing pipe<br />
Bohrtec<br />
BM 00<br />
Launch pit<br />
Surface <strong>of</strong> ground<br />
20 mm dia. casing pipe<br />
Tracti<strong>on</strong> head &<br />
equipment for measuring<br />
tractive force<br />
Fig. 8.5 Lowering a pipe into the arrival pit<br />
DN 300<br />
ductile cast<br />
ir<strong>on</strong> pipes<br />
The casing pipes and pipes for medium must be fitted with l<strong>on</strong>gitudinal force-fit joints<br />
Fig. 8.6 Coupling <strong>on</strong> a fresh pipe<br />
Arrival pit