Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus
Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus
Buderus Manual on Trenchless Installation of Ductile Cast ... - Duktus
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Trenchless</strong> replacement <strong>of</strong> gas and water pipelines<br />
3. <strong>Trenchless</strong> replacement <strong>of</strong> gas and water pipelines<br />
3 General<br />
There has been tremendous progress in the development <strong>of</strong> no-dig or trenchless techniques<br />
for installing new pressure pipelines and replacing old <strong>on</strong>es, particularly when this has to be<br />
d<strong>on</strong>e in inner city areas. There is an increasing trend towards the use <strong>of</strong> these techniques.<br />
Whereas large areas are covered with excavated soil when open-trench techniques are<br />
used, with trenchless techniques any nuisance <strong>of</strong> this kind is kept within acceptable limits.<br />
The following are some <strong>of</strong> the major advantages <strong>of</strong> trenchless techniques:<br />
• The digging-up <strong>of</strong> roads and earth-moving work are reduced by up to 80% or more<br />
(Fig. 3.1)<br />
• There is less excavated soil and bedding material to be transported (Fig. 3.2)<br />
• Less space is needed for the site equipment and facilities (this is particularly important<br />
in inner city areas, Fig. 3.3)<br />
• Sites can be c<strong>on</strong>fined to several small „points“ and it is therefore possible to cover the<br />
pit and put it out <strong>of</strong> reach <strong>of</strong> the weather, which benefits the quality <strong>of</strong> the product,<br />
i.e. the pipeline that is installed.<br />
Fig. 3.1 Space required for open-trench installati<strong>on</strong> Fig. 3.2 Open-trench and trenchless installati<strong>on</strong>:<br />
comparis<strong>on</strong> <strong>of</strong> volumes <strong>of</strong> material transported<br />
32<br />
Open-trench<br />
installati<strong>on</strong><br />
Equipment<br />
<strong>Trenchless</strong> installati<strong>on</strong><br />
Volume <strong>of</strong> material transported<br />
Fig. 3.3<br />
<strong>Trenchless</strong> installati<strong>on</strong> does not disrupt traffic