11.07.2015 Views

User ManUal - FlowVision GmbH

User ManUal - FlowVision GmbH

User ManUal - FlowVision GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FC100-CA | Flow MeterInstallationGMBHFit monitoring head with locking set (see fig. 12):• Fix first link of chain (1) into the clip (3).• Put chain catch (2) into link and fasten with the tight chain.Caution!Check locking system with regard to strength!The locking chain must be mounted as tightly as possible.Locking set 010Z122Z0002041231 chain 4 x 32 DIN 5685 (approx. 1 m)2 catch for chain NG 53 clip with screws and nuts DN15 to DIN 11850(tightening torque 10 Nm)fig. 1221

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!