Jurassic Coast Transport Infrastructure Gap Analysis Study
Jurassic Coast Transport Infrastructure Gap Analysis Study
Jurassic Coast Transport Infrastructure Gap Analysis Study
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Summary of potential improvements: Axminster5.3.18 The following improvements specific to Axminster are recommended:- Eliminate small upstand in gateway adjacent to café;- Widen footway outside station building;- Provide stop-specific bus timetable information;- Continue to liaise with rail and b us operators to achieve better bus-railconnections, especially for the new hourly rail timetable in 2009; and- Highlight the unpredictability of bus journey times (and consequentinability to guarantee bus-rail connections) as reason f or bettermanaging traffic in town centres on 31 bus route.Doc No 3 Rev: B Date: November 2008 93G:\Final Report Web version\CTR-ADA <strong>Study</strong> Report Rev9.4. doc