12.07.2015 Views

Jurassic Coast Transport Infrastructure Gap Analysis Study

Jurassic Coast Transport Infrastructure Gap Analysis Study

Jurassic Coast Transport Infrastructure Gap Analysis Study

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.6.3 Inconsistencies with NaPTAN data or stops which do not currently exist in thedatabase should be rectified or added by the ‘stop owner’ (usually the CountyCouncil as local highway authority). County Councils have a responsibility toprovide up-to-date bus timetable information in their area to South WestPassenger <strong>Transport</strong> Information (SWPTI), the regional partnership of localauthorities and major bus operators, to provide data for Traveline, the nationalpublic transport enquiry service. A nominated SWPTI co-ordinator at eachCounty Council will have responsibility for providing the updated bus serviceinformation and NaPTAN data, and is likely to be this officer who, afterdiscussion with the relevant local bus operator/s, will change the NaPTANdetails.3.6.4 The siting of new bus stops suggested overleaf will require the agreement ofthe relevant county council (as local highway authority) and the relevant busoperators. Road safety, bus operations and the convenience of passengers willalso need to be considered as part of this process.Doc No 3 Rev: B Date: November 2008 55G:\Final Report Web version\CTR-ADA <strong>Study</strong> Report Rev9.4. doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!