CHECKLIST<br />
Il\iPROVING COMBUSTION EFFICIENCY<br />
UKRAINIAN POWER PLANTS<br />
The following work will be performed at each plant, as a minimum·<br />
• Introduction and information exchange with plant management<br />
• Discussion and presentation ofthe scope ofwork<br />
• Identify the persons to be assigned for hands-on audit training<br />
• Provide training and assistance to the team selected on the use ofthe demonstration<br />
portable instrumentatIOn<br />
• Perform audit tests<br />
• Leave behind the demonstration portable instruments<br />
• Determine physical locations for installing the stationary instruments<br />
• Determine locations for installing the remote monitoring modules<br />
• Determine physical characteristics related to the locations for the stationary<br />
instruments