Il\iPROVING COMBUSTION EFFICIENCY<br />

UKRAINIAN POWER PLANTS<br />

The following work will be performed at each plant, as a minimum·<br />

• Introduction and information exchange with plant management<br />

• Discussion and presentation ofthe scope ofwork<br />

• Identify the persons to be assigned for hands-on audit training<br />

• Provide training and assistance to the team selected on the use ofthe demonstration<br />

portable instrumentatIOn<br />

• Perform audit tests<br />

• Leave behind the demonstration portable instruments<br />

• Determine physical locations for installing the stationary instruments<br />

• Determine locations for installing the remote monitoring modules<br />

• Determine physical characteristics related to the locations for the stationary<br />