• S906-01l02A/BURSHTYNIS/17/9S<br />
2.2 Purpose of the Audit<br />
The purpose of the audIt was to:<br />
• Assess overall techmcal and management capabihtles, plant energy efficIency, and<br />
capital investment decIsIon-makIng processes for each plant, assess plant<br />
procedures for IdentlfyIng and executing energy saVIng Investments requmng<br />
management changes, and capItal investment.<br />
• Identlfy short-term no-cost/low-cost efficiency measures WIth savIngs potentlal<br />
and paybacks.<br />
• ProVIde prehmmary IdentlficatlOn of longer term energy conservation<br />
opportumties (ECO's) requinng larger capital mvestment.<br />
3.0 DESCRIPTION OF POWER PLANT<br />
3.1 General Description<br />
The station IS of 2400 MW capacIty employing <strong>12</strong> x 200 MW turbme generators of Lemngrad<br />
Works manufacturer. The first umt was commIssIoned m 1965 and the final umt m 1969.<br />
ENERGO SYSTEM:<br />
LOCATION:<br />
LVIVENERGO<br />
INSTALLED CAPACITY: 2400 MW<br />
COMMISSIONED:<br />
FUEL:<br />
90 Km SOUTH OF LVIV<br />
<strong>12</strong> x 200 MW<br />
1965-1969<br />
Coal low-bituminous supplemented by mazut and gas<br />
For a more detaIled descriptlOn of the followmg items, see the Prehmmary AudIt Report, issued<br />
in December 1994, Reference 1 In AppendIx G.<br />
3.2 Boiler Plant<br />
The type TPlOO boilers are of Russian manufacturer from the Tagenrog Works The bOIler<br />
produces steam at a rate of 640 tons per hour at a pressure of 140 bar gauge and hve steam<br />
temperature of 545°C. Steam from the hIgh pressure turbine exhaust IS dIrected back to the<br />
boiler for reheat and returned to the mtermedlate pressure turbme at a pressure of 28 bar gauge<br />
and reheat temperature of 545°C. Feedwater IS supphed to the bOIler at a temperature of<br />
235°C.<br />
The boiler is of T shape design with a water cooled furnace of tangent tube constructlOn. The<br />