A low life time resource of the oxygen sensor life (1 year)<br />

Service maintenance IS not available<br />

(they were talking about having a representative In Moscow, but from the standpoint<br />

of Ukraine, that IS another country abroad, another currency and problem of<br />

lOgiStiCS Should have representative In Kiev or another large City )<br />

The Instrument has not been registered or certified with the State Standards of<br />

Ukraine<br />

REVIEW ON FUNCTIONING OF METER CYCLOPS 300AF/300<br />

The Instrument IS used for precise measurement of the temperatures of surfaces without<br />

direct contact with the medium In the range from -50 to 1000°C The adjustment people<br />

ofthe enterprise "Odessa Energo Naladka" used the Instrument for the follOWing purposes<br />

1 Measuring temperatures of the outSide surfaces of the cover bOiler aggregates at<br />

Odessa Heat Power Center to determine the heat losses Into the surroundings<br />

2 Measuring temperatures of surfaces, Insulation ofthe steam and hot water pipelines<br />

for restoring and repairing the heat Insulation of the pipelines<br />

3 To check the temperatures of heating the cases of the bearings of the rotating<br />

mechanisms and the temperature of heating the motors<br />

4 To check the temperatures of connections of the buss lines In the distributive<br />

deVices With the voltage of 0 4-6 KV<br />

5 To check the temperature of connections of the buss lines of open distributing<br />

deVices With the voltages of 6-110 KV, at transforming substations<br />

Usage of the Instrument cyclops 300AI/900 resulted In Identification of the places of<br />

damaging the outSide cover of the bOilers and Insulation of the pipelines Elimination of<br />

damaging of the cover and restoration of the pipeline Insulation made In due time resulted<br />

in reduction of the heat losses Into the environment from 0 05-0 15%<br />

Checking of temperatures of the bearings In rotating mechanisms (fans, smoke suckers<br />

(I D Fans), pumps, etc) allowed to replace them In due tIme preventing getting of the<br />

equipment out of order<br />

The systematic checking of the temperature of the connections of buss In the distributing<br />

deVices and at the substations permitted to prevent the emergency Situations at the<br />

Odessa Heat Power Center<br />

CONCLUSIONS<br />

The Instrument IS reliable and SUitable In operation, It has small overall size PrOViding<br />

availability of a printer, ItS pOSSible to register the readIngs<br />