• • • furnace is dIvided into
- Page 12 and 13:
• • The station has had sIgnifi
- Page 14 and 15:
Flue gas samples were also taken at
- Page 16 and 17:
4.2.2 Power Plant AudIts The audIt
- Page 18 and 19:
Ifonly a modest savings of about 0.
- Page 20 and 21:
ECO-06 MAZUT SONIC FLOW METERS The
- Page 22 and 23:
DESCRIPTION COST 2. SIlica Analyzer
- Page 24 and 25:
6.0 IMPLEMENTATION PHASE (Follow-up
- Page 26 and 27:
earings, contacts, etc The electric
- Page 28 and 29:
• • • BURSHTYN COAL CONSUMPTI
- Page 34 and 35:
DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37:
5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40:
Simple Payback for O2 Analyzers - 1
- Page 41 and 42:
5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45:
Reference air tstrmg Zircoma substr
- Page 49:
SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53:
.- The 1261 Calorimeter Operates in
- Page 58 and 59:
14 The 1750 Proximate Analyzer A ra
- Page 68:
5906-01/C12A1APPLNDIX/4/18/95 APPEN
- Page 79 and 80:
• • • • • BURSHTYN COAL Q
- Page 81:
• • • • Polsky Coal Pure Pr
- Page 86:
l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 91 and 92:
5906-01I02A1APPENDIX/41l8/95 APPEND
- Page 93:
5906-01/fJ2A/APPENDIXJ41l8/95 APPEN
- Page 96:
5906-01I02A/APPENDIX/411 8/95 APPEN
- Page 100 and 101:
• • • BOIlPOCHHK flO YKYtDIIE
- Page 103 and 104:
• • 5906-01 f02B/8f31197l8ursht
- Page 106 and 107:
• • • • ) ) mass flow meter
- Page 108:
) Audit Equipment RECOMMENDATIONS B
- Page 111:
• • t J • • • • ,-",I B
- Page 122 and 123:
') CHECKLIST IMPROVING COMBUSTION E
- Page 125 and 126: EXECUTIVE SUMMARY INTRODUCTION GENE
- Page 127 and 128: 9) Four (4) 02 analyzers rated for
- Page 129: INTRODUCTION ENERGO SYSTEM: LOCATIO
- Page 132 and 133: PC boilers. They are also intereste
- Page 150: 1.1 IntroductIon TRIP REPORT USAID/
- Page 155: • • • technology and requeste
- Page 161 and 162: TRIP REPORT Delivery Order No 6 - E
- Page 163 and 164: cooling water flow to condensers. N
- Page 165 and 166: • • • Information system for
- Page 167 and 168: • • • Instromet natural gas c
- Page 169 and 170: • • 1 PTVM-100, Station 2 - adj
- Page 171 and 172: availability of a pnnter, Its possi
- Page 173: The Infrared thermometer was used u
- Page 177 and 178: • • However, there are no recor
- Page 179 and 180: Month Consumption ODESSA CHP PLANT
- Page 181 and 182: Month Consumption ODESSA CHP PLANT
- Page 183 and 184: BURsHTYN NATURAL GAS 1996 P 1997 P
- Page 185: • • • • • • • Simfero