TRIP REPORT<br />

Delivery Order No 6 - Energy Efficiency and Reliability, Ukraine<br />

Subtask 2 3 - Implementation Phase (Follow-up Visit)<br />

July 21 to August 9,1997<br />

INTRODUCTION<br />

USAID has provided funds for Burns and Roe Enterprises, Inc to procure and supply<br />

energy efficiency instruments and perform plant audit VISits at seven Ukrainian Thermal<br />

Power Plants The objective of these VISitS has been to Improve combustion and bOiler<br />

efficiencies, Improve mOnitoring and energy management<br />

DUring February - March of 1995, each plant was prOVided with an Enerac combustion<br />

analyzer, a laptop computer and pnnter, an Infrared thermometer and a Fluke power<br />

analyzer<br />

Burns and Roe engineers conducted follow-up VISitS and training dunng JUly 22 - August<br />

16 In Ukraine In accordance with the Delivery Order objectives The follOWing report<br />

desCribes the actiVities of John E Hallberg, P E and Alexander Flllppov who vIsited KrivOI<br />

Rog TPP, Simferopol CHP Plant, Odessa CHP Plant and Burshtyn TPP A report<br />

desCribing the actiVities of George Keller, P E who vIsited Zmlev, Uglegorsk and<br />

Kourakhovska Power Plants IS Issued separately.<br />

WORK PLAN<br />

For each power plant<br />

1 Review the steps taken by the plant for Implementation of recommendations and<br />

assist In completion<br />

2 ProVide additional training and assistance on installation and use of the equipment<br />

3 Refine and finalize the audit report and the recommendations for short and long<br />

term actions based on follow-up diScussions with power plant personnel and minor<br />

additional audit work, If necessary<br />

4 Measure actual energy savings based on audit recommendations and eqUipment<br />

installation, If measurements are not pOSSible, estimate and proVide the rationale<br />

of the method that IS used for estimation<br />

TRIP REPORT AND RESULTS<br />

Mon & Tue. July 21-22.1997 - Travel to Kiev, Ukrame<br />

Wed. July 23. 1997 - Travel to Knvol Rog (Zelenodolsk)<br />

Thr & Fri. July 24-25. 1997 - In KnvOI/Rog TPP<br />

PERSONS MET DURING MEETINGS<br />

Vladimir F. Soroka - Chief Engineer (new)<br />

Peter Solovey - Chief of Maintenance De<strong>part</strong>ment<br />

RJabokon Nlkolay - Deputy Chief of Automation<br />