TRIP REPORT<br />
Delivery Order No 6 - Energy Efficiency and Reliability, Ukraine<br />
Subtask 2 3 - Implementation Phase (Follow-up Visit)<br />
July 21 to August 9,1997<br />
INTRODUCTION<br />
USAID has provided funds for Burns and Roe Enterprises, Inc to procure and supply<br />
energy efficiency instruments and perform plant audit VISits at seven Ukrainian Thermal<br />
Power Plants The objective of these VISitS has been to Improve combustion and bOiler<br />
efficiencies, Improve mOnitoring and energy management<br />
DUring February - March of 1995, each plant was prOVided with an Enerac combustion<br />
analyzer, a laptop computer and pnnter, an Infrared thermometer and a Fluke power<br />
analyzer<br />
Burns and Roe engineers conducted follow-up VISitS and training dunng JUly 22 - August<br />
16 In Ukraine In accordance with the Delivery Order objectives The follOWing report<br />
desCribes the actiVities of John E Hallberg, P E and Alexander Flllppov who vIsited KrivOI<br />
Rog TPP, Simferopol CHP Plant, Odessa CHP Plant and Burshtyn TPP A report<br />
desCribing the actiVities of George Keller, P E who vIsited Zmlev, Uglegorsk and<br />
Kourakhovska Power Plants IS Issued separately.<br />
WORK PLAN<br />
For each power plant<br />
1 Review the steps taken by the plant for Implementation of recommendations and<br />
assist In completion<br />
2 ProVide additional training and assistance on installation and use of the equipment<br />
3 Refine and finalize the audit report and the recommendations for short and long<br />
term actions based on follow-up diScussions with power plant personnel and minor<br />
additional audit work, If necessary<br />
4 Measure actual energy savings based on audit recommendations and eqUipment<br />
installation, If measurements are not pOSSible, estimate and proVide the rationale<br />
of the method that IS used for estimation<br />
TRIP REPORT AND RESULTS<br />
Mon & Tue. July 21-22.1997 - Travel to Kiev, Ukrame<br />
Wed. July 23. 1997 - Travel to Knvol Rog (Zelenodolsk)<br />
Thr & Fri. July 24-25. 1997 - In KnvOI/Rog TPP<br />
PERSONS MET DURING MEETINGS<br />
Vladimir F. Soroka - Chief Engineer (new)<br />
Peter Solovey - Chief of Maintenance De<strong>part</strong>ment<br />
RJabokon Nlkolay - Deputy Chief of Automation<br />
1