CONDENSER COOLING WATER<br />
Condenser cooling water is taken from an artificial lake which was created by damming a<br />
river at the same time the plant was constructed. The lake is used as a fish farm. and<br />
chemicals cannot be used to maintain condenser cleanliness. Therefore, condenser fouling<br />
with CaC0 3 , MgC0 3 and organics is a significant problem.<br />
Each condenser is cleaned twice per year and the average deposit thickness at the time of a<br />
cleaning is 3-4 mm. At the time of a condenser cleaning, there is a loss of condenser<br />
vacuum from 0.036 kgIcm 2 to 0.039 kg/cm 2 absolute pressure which causes as MW loss in<br />
generator output. Two condensers have Ukrainian design ball cleaning systems which were<br />
installed in 1990.<br />
BOILER MAKEUP WATER AND CITY WATER TREATMENT<br />
Lake water makeup is heated and sent to four (4) 150 TIH clarifiers and six (6) 3.0 meter<br />
diameter anthracite filters. From that point, water is sent to the city hot water district<br />
heating system softeners and to the boiler makeup water demineralizer. City water demand<br />
is 300 T/H and boiler makeup water demand is 240 TIH, and these two flows should be<br />
within the design rating of the equipment. However, the ion exchange material in the<br />
demineralizer is in such poor condition that lOOTIH are consumed in regenerating it. Also,<br />
the clarifiers are overloaded, suspended solids are overflowing, and large quantities of water<br />
are needed to backwash the filters.<br />
As a result of these conditions, the plant can meet a demand of 240 TIH for boiler<br />
feedwater, but can only supply 200 TIH to the city. The quality of city water is also not<br />
good due to high bacteria count. Another result of these conditions is high consumption of<br />
sulfuric acid and caustic soda for demineralizer regenerations.<br />
DISTRICT HEATING<br />
Steam is extracted from each turbine IP Cylinder to supply the district hot water heatmg of<br />
the nearby city and greenhouses.<br />
REHABILITATION PLANS<br />
IMPRESSARIO AGRUPADOS, an engineering consulting firm from Spain, conducted a<br />
major rehabilitation study in 1993 for EBRD. They evaluated seven alternatives for<br />
rehabilitation, including rebuilding boilers and replacing turbines with upgraded 225 MW<br />
machines, adding scrubbers, precipitators, replacing boilers with circulating fluidized bed<br />
(CFB) boilers, and gas turbine combined cycle repowering.<br />
The station is very interested in learning more about CFB technology as a solution to the<br />
problems resulting from poor coal - S02' NO x , and high maintenance on the old Taganrog<br />
59Q6.02JPAR.5/<strong>12</strong>19194 6