availability of a pnnter, Its possible to register the readings<br />
REMARKS<br />
1 The instrument has not been certified with the State Standards of Ukraine<br />
2 Service maintenance IS not available<br />
Sat. August 2. 1997 - Travel to Burshtyn<br />
Sun. August 3. 1997 - Rest and Wntlng<br />
Mon and lue. August 4-5. 1997 - In Burshtyn Power Plant<br />
PERSONS MET DURING MEETINGS<br />
Vasyl' Bendasluk - Director (New)<br />
Igor I Bozenenkow - Deputy Director - Foreign Affairs (Former Director)<br />
Orest Daniluk - Deputy Director - Technical<br />
Nlkolay Kobzev - Deputy Chief Engineer for Reconstruction and Development<br />
Gorgory Stepas - Deputy Chief Engineer - Operations<br />
Ivan Berkosha - Chief of Technical De<strong>part</strong>ment<br />
TanaslY Semotyuk - Head of Adjustments Workshop<br />
Mykola Korvotsky - Head of Chemical Workshop - GC<br />
Peter Choplk - Senior Forman Automation Workshop - O 2 Analyzers<br />
Dept of Automatic Control Systems<br />
Mlchall Zelanovsky - Deputy Chief of Adjustment Dept - Enerac, Infrasec<br />
Yaroslav Pynhh - Computer Specialist<br />
Nina Kryzhanovskaya - Senior Foreman - Electncal De<strong>part</strong>ment<br />
INSTRUMENTS SUPPLIED TO Burshtyn<br />
Zirtek oxygen analyzers, 2 probes for one T-bOller, 1 two-channel analyzer<br />
Panametncs two channel ultraSOnic transit time flow meter<br />
Instromet natural gas chromatograph, display control Unit and accessones<br />
Oxygen cell and consumables for Enerac<br />
DISCUSSION<br />
There have been significant management changes and finanCial problems at this power<br />
plant which seem to have had a negative effect on employee morale and successful results<br />
with USAID energy effiCiency and mOnitoring instrumentation<br />
• The new Director, Vasyl' Bendaslvk, came from Dobrotvotor APP 900 MW power plant<br />
There was a flUidized bed bOiler project at that plant which IS no longer operatmg The<br />
former Director IS now Deputy Director of Foreign Affairs There seems to be a lot of<br />
political in-fighting and lack of support for highly skilled and experienced technical<br />
specialists wanting to see progressive Improvements made<br />
• They are In the process of another organizational change In LVlvenergo where 300 new<br />
•<br />
11