poor condition that 100 TIH are consumed in regenerating it. Also, the clarifiers are<br />

overloaded, suspended solids are overflowing, and large quantIties of water are needed to<br />

backwash the fIlters.<br />

As a result of these conditions, the plant can meet a demand of 240 T/H for boiler feedwater,<br />

but can only supply 200 T/H to the CIty. The quality of city water is also not good due to high<br />

bacteria count. Another result of these conditions is high consumption of sulfuric acid and<br />

caustic soda for demineralizer regeneratIons.<br />

Rehabilitation Plans<br />

IMPRESSARIO AGRUPADOS, an engineering consulting firm from Spain conducted a major<br />

rehabilitation study in 1993 for EBRD. They evaluated seven alternatives for rehabilitatIon,<br />

including rebuilding boilers and replacing turbines WIth upgraded 225 MW machines, adding<br />

scrubbers, precipitators, replacmg boilers with crrculating fluidized bed (CFB) boilers, and gas<br />

turbine combined cycle repowenng.<br />

They are very interested in learning more about CFB technology as a solution to the problems<br />

resulting from poor coal - S02, NOx, and high maintenance on the old Taganrog PC boilers.<br />

They are also interested in western technology for instrumentation and control, and want to<br />

upgrade the automation on the rehabilitated block <strong>12</strong> as a demonstration project. Experience<br />

gained from application of a Distributed Control System (DCS) to block <strong>12</strong> would be applied<br />

to the 1995 reconstruction of blocks 11 and 7.<br />

A list of priority instruments (attached) was provided itemizing as a minimum primary field<br />

instruments (transmitters, etc.) which are presently needed for block <strong>12</strong>.<br />

They are planning to add one or two gas frred peaker boilers to meet additional hot water district<br />

heating demand from city.<br />

Power plant design work is being done by Ukraine Teploelectroproject, L'VIV Research Institute<br />

and Transmission design is being done by Electrosetproject in L'VIV.<br />

Mana2ement Capabilities<br />

The ClIP plant management gathers detailed information and performance data on all aspects<br />

of the equipment operation and mamtenance. Therefore, data on gas and mamt fuel<br />

consumption, gross and net K.W output, steam and hot water (gcal heat) for monthly (heatmg<br />

periods) and annual basis is easily obtamed. This data will be used for comparing ClIP plant<br />

performance audit before and after implementation of "no cost - low cost" efficiency<br />

improvement equipment and procedures to improve monitoring and energy management.<br />

The plant personnel are very knowledgeable and cooperatIve. They are aware of equipment and<br />

instrument deficiencies and the need for upgrading and applying western technology for<br />

improving combustion and energy efficiency.<br />