CHECKLIST<br />

IMPROVING COMBUSTION EFFICIENCY<br />

UKRAINIAN POWER PLANTS<br />

The following work will be performed at each plant, as a minimum:<br />

• Introduction and information exchange with plant management<br />

• Discussion and presentation ofthe scope ofwork<br />

• Assess both technical and managerial capabilities<br />

• Establish points ofcontacts<br />

• Identify any local support, ifavailable<br />

• Identify and coordinate the work schedule<br />

• Discussion with key personnel regarding operation ofthe plant<br />

• Determine the availability ofthe existing sources ofinformation and data<br />

• Determine the plant historical operating data<br />

• Walk through the plant to determine the requirements for selected<br />

instrumenta1ions:<br />

Combustion analysers<br />

Fuel flow meters. gas, on or coal<br />

Oxygen analyzers<br />

• Review ofexisting P&ID's to determine locations ofmonitoring points<br />

• Determine physica11ocations for installing the selected primary element<br />

• Determine locations for installing the remote monitoring modules<br />

• Identify the persons to be assigned for on-the-job audit tTaining