1.1 IntroductIon<br />

TRIP REPORT<br />

USAID/ENI retained Bums and Roe Enterpnses, Inc. (BREI) to perform plant audit VISItS to<br />

seven Ukralman Thermal Power Plants (TES).<br />

The objective of these audit visits IS to improve the combustlOn efficIency of the UkraInian<br />

Power Plants.<br />

Burns and roe performed the plant audit visits dunng a Feb 6--Mar 11 trip to the UkraIne In<br />

accordance with the Delivery Order objectives. The folloWIng report describes the actiVIties of<br />

Team #2 (John E. Hallberg, P.E. and Prem Gupta), which visited Odessa CHP plant,<br />

Simferopol CHP plant, Krivoi Rog TPP and Burshtyn TPP. A report descnbmg the activities<br />

of Team #1 (Selisett Corban, P.E. and George Keller, P.E.) WhICh visited Kourakhovska,<br />

Uglegorsk and ZmIev TES was issued separately.<br />

1.2 Work Plan<br />

The follOWIng work was planned for each plant audit VISIt:<br />

• Perform introduction and information exchange wIth the plant management.<br />

• Discuss and present scope of the work.<br />

• Identify personnel to be assigned for hands-on audit training.<br />

• Provide traIning and assistance to the team selected for the use of the<br />

demonstration portable InstrumentatlOn.<br />

• Perform audit tests.<br />

• Turn over the demonstration portable instrumentation to the plant management<br />

and sign the papers.<br />

• Determine best location for installing stationary instruments.<br />

• • Determine best location for Installing receIver Instruments.<br />

• Define process and environmental condltlOnS as well as length of the cable runs.<br />

•<br />

•<br />

5906..QI/CJ2AITRJP/4nt95 1