PC boilers.<br />
They are also interested in western technology for instrumentation and control and want to<br />
upgrade the automation on the rehabilitated Unit <strong>12</strong> as a demonstration project. Experience<br />
gained from application of the Programmer Logic Controllers (PLCs) to Unit <strong>12</strong> would be<br />
applied to the 1995 reconstruction of Units 11 and 7.<br />
A list of priority instruments was provided itemizing as a minimum primary field instruments<br />
(transmitters, etc.) which are presently needed for Unit <strong>12</strong>.<br />
They are planning to add one or two gas fired peaker boilers to meet additional hot water<br />
distnct heating demand from city.<br />
Power plant design work is being done by Ukraine Teploe1ectroproject, L'VIV Research<br />
Institute and Transmission design is being done by Electrosetproject in L'VIV.<br />
MANAGEMENT CAPABIL:rrms<br />
The power station management gathers detailed information and performance data on all<br />
aspects of the equipment operation and maintenance. Therefore, data on gas and mazut fuel<br />
consumption, gross and net KW output, steam and hot water (gca1 heat) for monthly (heating<br />
periods) and annual basis is easily obtained. This data will be used for comparing plant<br />
performance audit before and after implementation of "no cost - low cost" efficiency<br />
improvement equipment and procedures to improve combustion efficiency of the plant.<br />
The plant personnel are very knowledgeable and cooperative. They are aware of equipment<br />
and instrument deficiencies and the need for upgrading and applying western technology for<br />
improving combustion efficiency of the boilers.<br />
S906-02IPAR.5/<strong>12</strong>19194 7