COMBUSTION EFFICIENCY AUDIT REPORT<br />

UKRAINIAN POWER PLANTS<br />

BURSHTYN POWER PLANT<br />

TABLE OF CONTENTS<br />

Page<br />

1.0 EXECUTIVE SUMMARY 1<br />

1.1 Introduction 1<br />

1.2 Principal Findmgs 1<br />

1.3 Recommendations 2<br />

2.0 BACKGROUND 3<br />

2.1 Objectives of Energy Saving Program 3<br />

2.2 Purpose of the AudIt 4<br />

3.0 DESCRIPTION OF POWER PLANT 4<br />

3.1 General Description 4<br />

3.2 BOller Plant 4<br />

3.3 Coal Handling 5<br />

3.4 Mazut Supply 5<br />

3.5 Gas Supply 5<br />

3.6 Boiler Efficiency CalculatIons 5<br />

3.7 Process Control System 5<br />

3.8 Environmental Issues 6<br />

3.9 Future Plans 6<br />

3.10 Inspection, Assessment, Comments 6<br />

4.0 DESCRIPTION OF AUDIT ACTIVITIES 7<br />

4.1 Specific Audit ActiVItIes 7<br />

4.1.1 Scope and Methodology 7<br />

4.1.2 General 8<br />

4.1.3 BOller Efficiency 8<br />

41.4 130iler l?lant 9<br />

5906-01lO2AlPreface 2/5/17/95