In Plant Cost to Produce Import Power Annual Ave. Cost<br />
Winter - 3 Kp/KWh (1 65¢) 65 Kp/KWh (3 57¢) 65 Kp/KWh (3 57¢) 8<br />
Summer - 20 Kp/KWh (10 9¢) 6 5 Kp/KWh (3 57¢) 65 Kp/KWh (3 57¢) 8<br />
ODESSA - 31 July 1997<br />
Avg.<br />
Sell<br />
In the result ofthe computatIon modes and elimInation ofthe insulation defects earned with<br />
application of Instruments Enerac + Cyclops, these were achieved economy offuel In terms<br />
of the condition of fuel. (7000 KCaIlKg)<br />
Consumption of Conventional Fuel Savings<br />
1995<br />
1996<br />
1997<br />
878 tons<br />
724 tons<br />
222 tons<br />
04%<br />
04%<br />
02%<br />
For the penod of operation of the gas analyzer Enerac 2000 between March 1995 and<br />
December 1996, a bngade team of adjusters and engineers of the Central Research and<br />
TechnIcal De<strong>part</strong>ment of Odessa Energy Adjustment, there were fulfilled the works that are<br />
Similar for 9 out of 14 installed bOilers<br />
Odessa Heat Power Plant - Mode and ecological and heat and techmcal tests of the steam<br />
bOilers KU-1<br />
1 TP-170, Station #5, 6, 7, and 8 adjustments of the furnace mode, ecological and<br />
heat and techmcal tests with optImIzation of the harmful substances In the coming<br />
out smoke output gases<br />
2 TP-47, Station 10 adjustment of the furnace mode, ecologIcal and heat and<br />
chemical adjustment with optimization of exhaust of the harmful substances Into the<br />
atmosphere in the coming out smoke gases<br />
• At the bOIler of KU-2<br />
•<br />
1 GM-50, Station 1, 2, 3 adjustment of the furnace mode, ecologIcal, heat and<br />
technical adjustment with optImization of the exhausted harmful substances,<br />
At the bOilers of the water heating bOiler house of Odessa Heat Power Plant.<br />