member countries and in <str<strong>on</strong>g>the</str<strong>on</strong>g> EU as a whole. The CEIOPS FSC will draw<br />

up guidelines for sampling in individual member countries for QIS2.<br />

These guidelines will be principle-based (such as significant<br />

representati<strong>on</strong>, variety) and allow for <str<strong>on</strong>g>the</str<strong>on</strong>g> possibility <str<strong>on</strong>g>to</str<strong>on</strong>g> align <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

samples with <str<strong>on</strong>g>the</str<strong>on</strong>g> particularities of <str<strong>on</strong>g>the</str<strong>on</strong>g> nati<strong>on</strong>al markets.<br />

13.19 While participating in a QIS exercise is opti<strong>on</strong>al for any undertaking, all<br />

undertakings wishing <str<strong>on</strong>g>to</str<strong>on</strong>g> participate should have <str<strong>on</strong>g>the</str<strong>on</strong>g> possibility <str<strong>on</strong>g>to</str<strong>on</strong>g> do so.<br />

CEIOPS takes <str<strong>on</strong>g>the</str<strong>on</strong>g> view that taking part in QIS will give insurers <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

opportunity <str<strong>on</strong>g>to</str<strong>on</strong>g> c<strong>on</strong>tribute in shaping <str<strong>on</strong>g>the</str<strong>on</strong>g> subsequent technical advice<br />

that CEIOPS gives <str<strong>on</strong>g>the</str<strong>on</strong>g> EU <str<strong>on</strong>g>Commissi<strong>on</strong></str<strong>on</strong>g>, particularly because QIS will<br />

allow a dialogue with insurers and associati<strong>on</strong>s about <str<strong>on</strong>g>the</str<strong>on</strong>g> practicalities<br />

of <str<strong>on</strong>g>the</str<strong>on</strong>g> approaches envisaged. Coverage of <str<strong>on</strong>g>the</str<strong>on</strong>g> samples will probably be<br />

a lesser issue in <str<strong>on</strong>g>the</str<strong>on</strong>g> subsequent QIS exercises than in <str<strong>on</strong>g>the</str<strong>on</strong>g> first as <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

interest in participati<strong>on</strong> is expected <str<strong>on</strong>g>to</str<strong>on</strong>g> increase.<br />

13.20 The participati<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> QIS of undertakings bel<strong>on</strong>ging <str<strong>on</strong>g>to</str<strong>on</strong>g> groups<br />

operating in more than <strong>on</strong>e <str<strong>on</strong>g>European</str<strong>on</strong>g> country should be coordinated<br />

between <str<strong>on</strong>g>the</str<strong>on</strong>g> nati<strong>on</strong>al supervisors c<strong>on</strong>cerned.<br />

Timing issues<br />

13.21 Timing issues are clearly a challenge <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> process of carrying out <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

QIS. The process of c<strong>on</strong>ducting a QIS and processing a result is<br />

estimated <str<strong>on</strong>g>to</str<strong>on</strong>g> take approximately 5 <str<strong>on</strong>g>to</str<strong>on</strong>g> 6 m<strong>on</strong>ths from <str<strong>on</strong>g>the</str<strong>on</strong>g> point in time<br />

where all necessary input is received<br />

• drafting of spreadsheets & guidance (2 -3 weeks);<br />

• c<strong>on</strong>ducting a pre-test and amending <str<strong>on</strong>g>the</str<strong>on</strong>g> framework (4 weeks);<br />

• QIS calculati<strong>on</strong>s (<str<strong>on</strong>g>the</str<strong>on</strong>g> undertakings should be allowed at least 8<br />

weeks and up <str<strong>on</strong>g>to</str<strong>on</strong>g> 12 weeks for <str<strong>on</strong>g>the</str<strong>on</strong>g> initial QIS);<br />

• validating and checking spreadsheets and preparing country<br />

reports (4 weeks);<br />

• summarising c<strong>on</strong>clusi<strong>on</strong>s from country reports (3-4 weeks); and<br />

• c<strong>on</strong>sultati<strong>on</strong> <strong>on</strong> changes or additi<strong>on</strong>s <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> advice previously<br />

submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> EU <str<strong>on</strong>g>Commissi<strong>on</strong></str<strong>on</strong>g> will follow <str<strong>on</strong>g>the</str<strong>on</strong>g> timeframes<br />

outlined in CEIOPS' statement <strong>on</strong> C<strong>on</strong>sultative practices.<br />

13.22 It is recognised that this timeframe is ambitious and may have <str<strong>on</strong>g>to</str<strong>on</strong>g> be<br />

extended in light of <str<strong>on</strong>g>the</str<strong>on</strong>g> experience. QIS will need <str<strong>on</strong>g>to</str<strong>on</strong>g> be undertaken <strong>on</strong><br />

a best effort basis in order <str<strong>on</strong>g>to</str<strong>on</strong>g> provide timely input <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>Commissi<strong>on</strong></str<strong>on</strong>g>’s<br />

impact assessment of <str<strong>on</strong>g>the</str<strong>on</strong>g> Framework Directive.<br />

13.23 Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rmore <str<strong>on</strong>g>the</str<strong>on</strong>g> end-of year issue is taken in<str<strong>on</strong>g>to</str<strong>on</strong>g> account. The key<br />

c<strong>on</strong>siderati<strong>on</strong> is existing reporting c<strong>on</strong>siderati<strong>on</strong>s – most undertakings<br />

will be very busy with end-year reporting in <str<strong>on</strong>g>the</str<strong>on</strong>g> first quarter. It is<br />