13.07.2015 Views

Flexicom cx combination boiler - installation and service manual

Flexicom cx combination boiler - installation and service manual

Flexicom cx combination boiler - installation and service manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10 Telescopic Flue - Length, Preparation <strong>and</strong> Installation12929Diagram 10.8Diagram 10.9129771301810.5 Flue FittingIMPORTANT:-The flue seals are sensitive to mineral oil based lubricants. Donot grease the seals. If the seals do need to be lubricateduse only water.During the <strong>installation</strong> of the flue system, ensure that debrissuch as mortar, filings or swarf are cleared from the fluesystem before completion.Inspect the flue pipes before fitting <strong>and</strong> do not install damagedor dented flue components.When assembling the flue system, ensure that the innerseals are not damaged, do not install a flue component with adamaged seal.When fitting flue elbows ensure that they are fitted at thecorrect angle to avoid strain, this will ensure that the seal fitscorrectly preventing leakage.With the air duct seams aligned <strong>and</strong> the flue set to therequired length ‘Y’, mark the securing hole position in the airduct. Drill a 3mm diameter hole at this position, take care notto pierce the inner flue duct. Secure with screw provided <strong>and</strong>tape the joint, see diagram 10.8.Fit the sealing collar onto the locating ring on the flue terminal,see diagram 10.9.With the flue elbow removed, push the flue assembly intothe wall, externally or internally, until the end of the assemblyprotrudes a short way from the inside face of the wall. Thiswill enable the internal trim ring (if required) to be positioned<strong>and</strong> allow the flue assembly to be drawn back up to the flueelbow.Secure the flue elbow in position on top of the <strong>boiler</strong> with thefour screws supplied.Draw the flue assembly from wall <strong>and</strong> engage the flue ductinto the elbow <strong>and</strong> butt fit between the air duct <strong>and</strong> flue elbow.Fit the securing collar into position.Ensuring correct alignment of the flue, mark through two of thepre drilled holes in the securing collar.Remove securing collar <strong>and</strong> drill two 3mm diameter holes, onein the elbow <strong>and</strong> one in the air duct, take care not to pierce theinner flue duct. Fit the securing collar <strong>and</strong> secure with screwsprovided, see diagram 10.10.Slide the internal trim ring back against the wall, securing inplace with a small amount of sealant if required.Insert the flue duct into the air duct terminal assembly,remembering to engage the catch within the terminal. Checkthat the outer rubber sealing collar makes an effective sealagainst the wall face.Diagram 10.1024

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!