<strong>SBM</strong> <strong>Offshore</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2008</strong> / <strong>Report</strong> of the Board of Management39of 12 years at the Cachalote field offshore Brazil.Disconnection from the Golfinho field is plannedfor June 2009, followed by an upgrade of the unitin Singapore with first oil at the Cachalote field inFebruary 2010;• In January, start of operation of the FPSO Mondoin the Kizomba ‘C’ field offshore Angola under thefifteen year lease contract with Exxon Mobil;• In July, start of operation of the FPSO Saxi Batuquein the Kizomba ‘C’ field offshore Angola under thefifteen year lease contract with Exxon Mobil;• At the end of December, hook up of the FPSOEspirito Santo in the BC-10 field offshore Brazil underthe fifteen year lease contract with Shell. The leasecommenced on 1 January 2009.• In May, the FPSO Mystras, previously owned byFPSO Mystras Produção de Petroleo LTDA (FMPP),a 50% owned subsidiary of the Company, has beenpurchased by Agip Energy and Natural Resources(Nigeria) Ltd. (AENR);• In July, the FPSO Tantawan Explorer in Thailand hasbeen purchased by Chevron <strong>Offshore</strong> Thailand Ltd. atthe end of the lease and operate contract;• At the end of October, FPSO Rang Dong I in Vietnamhas been redelivered to the Company by JapanVietnam Petroleum Company Ltd. (JVPC) at theend of the confirmed lease period including a shortextension. The unit has been disconnected anddecommissioned and is currently laid up;• The FSO Okha has been redelivered to the Companyby Sakhalin Energy Investment Company Ltd.(SEIC) in December <strong>2008</strong>, at the end of the leaseperiod. The FSO will be converted into a FPSOas replacement of the Cossack Pioneer FPSO forWoodside Energy Limited.Turnkey Supply and Services Activities• Completion of an external turret for an FSO forTanker Pacific <strong>Offshore</strong> Terminal Pte Ltd. (TPOT) foroperation in the Su Tu Vang field offshore Vietnam;• Delivery of a turret for the LPG FSO for the Belanakfield in Indonesia for ConocoPhillips;• Delivery of a deepwater CALM buoy for Total for theAkpo field development offshore Nigeria;• Mechanical completion of the Frade FPSO at DubaiDrydocks;• A contract was obtained from Petrobras for theturnkey supply and three years of operation of theP-57 FPSO to be installed on Jubarte field offshoreBrazil. The delivery of the unit in Brazil, ready forinstallation, is planned for end of 2010;• A contract was awarded by Woodside EnergyLimited and the Cossack Wanaea Lambert Hermes(CWLH) Joint Venture for the turnkey supply of theTransfer of a cargo from the FSO Okha into a shuttle tanker moored in tandem offshore the northern part of Sakhalin Island, Russia
40 <strong>SBM</strong> <strong>Offshore</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2008</strong> / <strong>Report</strong> of the Board of Managementdisconnectable FPSO Okha, to be installed offshoreAustralia as replacement of the existing FPSOCossack Pioneer. Delivery of the unit is scheduled forthe fourth quarter of 2010;• A call off frame contract was obtained from BPAngola for the supply of FPSOs offshore Angola;• A contract was awarded by Total E&P Angola to aconsortium of <strong>SBM</strong> <strong>Offshore</strong>/APL for the supply andinstallation of the Oil Loading System on the Pazflorproject. The Company’s scope of work consists ofsupply of the (2) Oil Offloading Lines, to be basedon the Trelline, and the offshore installation of thecomplete Oil Loading System;• A contract was obtained from Resolution ShippingLtd. (Cyprus), a subsidiary of Vroon Group, for thesupply of two 1,000 ton cranes and two jackingsystems, with a total jacking capacity of 22,500 tonseach, for two wind turbine installation jack-up vessels(<strong>SBM</strong> <strong>Offshore</strong> group design).Details of these main events and of the other activities inthe year <strong>2008</strong> are presented hereafter.Lease and Operate ActivitiesAt the start of <strong>2008</strong> there were twenty-two long-termlease and operate contracts in hand for production and/or storage systems, seventeen of which were at that datein operation and the other five units under construction.Furthermore, there were contracts for the management ofthe operation of three client owned units.All units in operation performed without any major problemsduring the year at a cumulative average throughput ratejust above 850,000 barrels per day. A total of 311 millionbarrels were exported from the fleet in the year <strong>2008</strong>,representing a total of 545 tanker offloading operations.Total production uptime of the fleet reached 99%. This highuptime has been the basis for the payment of substantialbonuses, in particular for the units operating under longtermcontracts with Petrobras and the FPSOs operatingfor ExxonMobil, for which the operating contracts aresubject to bonus schemes taking into account not only theproduction performance but also safety and environmentalstatistics and adherence to the operating budget.On 1 January <strong>2008</strong>, FPSO Mondo started operations inthe Kizomba ‘C’ field offshore Angola under a fifteen yearlease and operate contract with Exxon Mobil. The unit hasbeen in operation for over a year and has achieved 99.7%up time and an average daily production of approximately90,000 barrels of oil per day.In July, FPSO Saxi Batuque started operations in theKizomba ‘C’ field offshore Angola under the fifteen yearlease and operate contract with Exxon Mobil. The unit hasbeen in operation for 184 days on 31 December <strong>2008</strong> andachieved 96.9% up time with an average daily productionof approximately 90,000 barrels of oil per day.With FPSO Mondo and FPSO Saxi Batuque in operation,the total number of leased FPSOs in production in Angolain partnership with Sonangol has now reached five.In May <strong>2008</strong>, the Company received a one-year extensionof the lease and operate contract for the FPSO Falcon withEsso Deepwater Limited, a subsidiary of Exxon Mobil. TheFPSO Falcon, which is fully owned and operated by theCompany is consequently under contract until 23 November2009. The FPSO is currently laid up in anticipation of ExxonMobil finding a suitable field development for which it canmobilise the FPSO.Also in May <strong>2008</strong>, FPSO Mystras Produção de PetroleoLTDA (FMPP), a 50% owned subsidiary of <strong>SBM</strong> <strong>Offshore</strong>N.V., received a notice from Agip Energy and NaturalResources (Nigeria) Ltd. (AENR), exercising AENR’s optionunder the Service Agreement to purchase the FPSOMystras. The delivery of the unit took place on station in