13.07.2015 Views

2008 Annual Report - SBM Offshore

2008 Annual Report - SBM Offshore

2008 Annual Report - SBM Offshore

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SBM</strong> <strong>Offshore</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2008</strong> / <strong>Report</strong> of the Board of Management49The Dynamic Installer has executed essentially third partycontracts:The type and complexity of this activity covers a very widerange but included:• platform inspection for Stapem, offshore Angola;• umbilical laying for Hess, offshore Equatorial Guinea;• laying of electrical cable and floating hoses and buoychange out for Total, offshore Cameroon;• saturation diving works for drilling rig assistance forStapem Oombo, offshore Angola;• retensioning of FPSO Kuito CALM buoy chains forChevron in Angola;• cable laying and ROV inspection on Sendji field forTotal, offshore Congo;• chain retensioning of FPSO Palanca for Sonangol,offshore Angola;• CALM buoy change out for CNL, offshore Nigeria;• cable laying for Eni, offshore Congo;• saturation diving works for DSME, offshore Angola.After Sales ServicesWith over three hundred CALM type terminals and fiftyFPSO and FSO mooring systems supplied by the Companycurrently in operation, the supply of spare parts andoverhauls of such systems reached a record year in saleswith good margins.The ‘Normand Installer’ preparing for installation of suctionpiles for FPSO Espirito Santo offshore Brazil• refurbishment of the soft yoke and swivel stack forthe CNOOC BZ28 FPSO offshore China;• overhaul of two CALM buoys in Nigeria;• supply of a very large roller bearing for VietsovpetroCALM soft Yoke mooring for Chi Linh FSO;• replacement of anchor chains of the Palanca FSO forSonangol in Angola;• refurbishment of the swivel stack of FPSO Curlew forMaersk in the UK.Swivel and mechanical components manufacturingManufacturing of proprietary mechanical componentsfor the turret system, like swivel stacks, bearings andarticulations is an increasingly active part of the overallservices activities. For the manufacturing of these partsthe Company has created long-term relationships withkey fabricators in order to ensure that the stringent qualityand safety requirements for manufacturing are met. Inthe majority of the cases this group is serving in-houseprojects as an internal supplier, but external clients areserved as well. Externally the Company has supplied theNorne replacement swivel stack for StatoilHydro, whichwas delivered and installed in <strong>2008</strong>, and five other swivelstacks supplied for the Company’s FPSO projects duringthe year.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!