13.07.2015 Views

Human Resources in Canada's Built Heritage Sector: Mapping the ...

Human Resources in Canada's Built Heritage Sector: Mapping the ...

Human Resources in Canada's Built Heritage Sector: Mapping the ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HUMAN RESOURCES IN CANADA’S BUILT HERITAGE SECTOR4. Woodwork<strong>in</strong>g:• f<strong>in</strong>ish carpenters• framers (traditional post and beam fram<strong>in</strong>g)• la<strong>the</strong>rs5. Marble, Tile, and Terrazzo Work:• marble workers• tile workers• terrazzo workers6. Glass Work:• glaziers• leaded glass restorers7. Traditional Roof<strong>in</strong>g Systems:• slate roof<strong>in</strong>g <strong>in</strong>stallers• wood sh<strong>in</strong>gle <strong>in</strong>stallers8. Pa<strong>in</strong>t<strong>in</strong>g and Decorat<strong>in</strong>g:• plasterers• pa<strong>in</strong>ters9. Mechanical Trades• plumbers / pipefitters• electricians• HVAC <strong>in</strong>stallers10. Project ManagersIn <strong>the</strong> case of <strong>the</strong> electrical and mechanical trades, <strong>the</strong> primary issues perta<strong>in</strong> to design and specificationnot to particular manner of work<strong>in</strong>g with materials or to work<strong>in</strong>g procedures. Design and specification isundertaken by eng<strong>in</strong>eers and architects, not by <strong>the</strong> trades.A fur<strong>the</strong>r important function <strong>in</strong> this segment of <strong>the</strong> <strong>Built</strong> <strong>Heritage</strong> Project Cont<strong>in</strong>uum is <strong>the</strong> role playedby General Contractors. (General contract<strong>in</strong>g is more accurately described as a function, ra<strong>the</strong>r than anoccupation.)For this segment of <strong>the</strong> <strong>Built</strong> <strong>Heritage</strong> Project Cont<strong>in</strong>uum, <strong>the</strong> key analytical task is to identify and def<strong>in</strong>e<strong>the</strong> specialized skill-sets <strong>in</strong> relation to particular build<strong>in</strong>g materials.Facility Management:In this context <strong>the</strong> title Facility Management perta<strong>in</strong>s to <strong>the</strong> management of <strong>the</strong> physical structure, not to <strong>the</strong>management of cultural programmes, etc. that may be delivered with<strong>in</strong> <strong>the</strong> physical structure. In smaller projects,however, Facility Management functions may be comb<strong>in</strong>ed with Programme Management. Larger entitiesmay require persons with specialized eng<strong>in</strong>eer<strong>in</strong>g or architectural skills to manage a portfolio of sites.70©CULTURAL HUMAN RESOURCES COUNCIL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!