13.07.2015 Views

Jamaica Biofuels Report - Ministry of Energy

Jamaica Biofuels Report - Ministry of Energy

Jamaica Biofuels Report - Ministry of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

higher wood cost will have a detrimental effect on the rate <strong>of</strong> return making the investmentless attractive.Figure 2: Effect <strong>of</strong> the cost <strong>of</strong> wood fuel on the internal rate <strong>of</strong> return (IRR) <strong>of</strong> the investmentfor the Frome Estate.Electricity Selling PriceAnother crucial factor, as with any cogen operation, is the price at which excess electricity willbe sold to the State-controlled Utility Company. The Mukherji report assumed $0.10/kWh,although the authors advocated higher prices to make the investment more attractive. For thepurpose <strong>of</strong> the base case evaluation provided above we assumed $0.10/kWh, but assessed theeffect <strong>of</strong> higher prices on the base case IRR <strong>of</strong> 11.50%. We performed a sensitivity analysis byvarying the feed-in tariff between $0.10/kWh and $0.15/kWh. The results are shown in Figure3.The effect <strong>of</strong> the electricity selling price on the IRR is dramatic underlining the importance <strong>of</strong>this issue to prospective investors. As the feed-in tariff rises from $0.10/kWh to $0.15/kWh, a50% increase, the IRR jumps from 11.50% to 18.73%, a 63% increase. This is not surprising,since the revenues from the sale <strong>of</strong> electricity represent a significant portion (27.4%) <strong>of</strong> theFrome operation’s total revenues from the start.It should be noted that when sugar prices fall, electricity from cogeneration provides a financialcushion to help maintain the overall pr<strong>of</strong>itability <strong>of</strong> the mill. Moreover, a year-roundcogeneration plant at the mill largely eliminates any need for the mill to import electricity fromthe grid even in the out-<strong>of</strong>-season period. In addition, the cogeneration plant provides roundyear capacity to the utility company thereby avoiding the need for <strong>Jamaica</strong> to build such anamount <strong>of</strong> additional capacity under its expansion plans.88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!