13.07.2015 Views

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4-1List <strong>of</strong> Containment PenetrationsPen. Pipe No. Description Valve Operation LocationNo. 3PP-T81/4” pneumatic tubing, supply airto purification flow control valvePP-8V positionerSolenoid, CC-17VClose on highcontainment pressureRev. VI 49PP-T35PP-T36SL-124SL-126SL-1271/4” pneumatic tubing, air ventfrom valve PP-7V positioner1/4” pneumatic tubing, air ventfrom valve PP-8V positioner1” air manifold to atmosphere,vent for diaphragm valves insidecontainment3/4”flush flow to primary pumpsPS-P1 & PS-P23/4” flush flow to primary pumpPS-P43/4” flush flow to primary pumpPS-P368 18” x 24”manhole (floodinghatch)69 18” x 24” manhole (floodinghatch)70 CW-71 4” sch 40, CW system water toletdown coolers PP-C1 & PP-C2Solenoid, CC-24VSolenoid, C-25V2 solenoid, CC-19V & CC-26VCheck, SL-<strong>10</strong>9VCheck, SL-111VCheck, SL-112VCheck, CW-177V71 <strong>10</strong>” ventilation purge air Gate WL-13V; normallyclosed except when purgingcontainment with reactorshutdownClose on highcontainment pressureClose on highcontainment pressureClose on highcontainment pressureManual reach-rodoperatedLower reactor compartment,lower stbd fwdLower reactor compartment,lower stbd aftLower reactor compartment,stbd aftLower reactor compartment,stbd fwdUpdated Final Safety Analysis Report - (STS-004-002)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!