13.07.2015 Views

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.1.2 General Performance DataUpdated Final Safety Analysis Report - (STS-004-002)7.1.2.2 Leakage From Primary SystemDuring the NSS’s operating period, most <strong>of</strong> the leakage from the primary system was from thebuffer seal (SL) system reciprocating charge pumps and from the diaphragm-operated reliefvalves. Maintenance techniques for the buffer seal charge pumps (which took suctiondownstream <strong>of</strong> the primary system demineralizers) were steadily improved. Improvements inthe design and testing sequence <strong>of</strong> the relief valves reduced the leakage. As a result <strong>of</strong> theseimprovements, leakage was reduced from a maximum <strong>of</strong> 1200 gpd to 50-<strong>10</strong>0 gpd. Leakagefrom the buffer seals <strong>of</strong> the control rod drive shafts and from the valve stem packing was alwayswell within acceptable and anticipated limits.7.1.2.2 VibrationThe primary system was subjected to propeller-induced vibrations that were transmitted directlythrough the hull <strong>of</strong> the ship. During the design <strong>of</strong> the reactor plant, the vibration characteristics<strong>of</strong> the primary system were analyzed using a scale model. As a result, a system <strong>of</strong> energyabsorbinghydraulic vibration dampers were designed and installed on the major components toprevent harmful vibration <strong>of</strong> the primary system in the range <strong>of</strong> the propeller blade frequency (5to <strong>10</strong> cps).Rev. VI 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!