13.07.2015 Views

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

10 CFR 50.71(e) - Maritime Administration - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4-1List <strong>of</strong> Containment PenetrationsPen. Pipe No. Description Valve Operation LocationNo. 3Rev. VI 5180 RM-19 1” hydrogen & radiationmonitoring sample return line81 RM-1 1” hydrogen & radiationmonitoring sample supply line82 1-1/2” sch 40 leak test referencesystem outletSolenoid, CC-30VSolenoid, CC-29VSolenoid, CM-20VClose on highcontainment pressureClose on highcontainment pressureClose on highcontainment pressureLower reactor compartmentstbd aftLower reactor compartment,stbd aftLower reactor compartment,port aft83 1-1/2” sch 40, unassigned Lower reactor compartment,port aft84 1-1/2” sch 40 leak test referencesystem inlet85 1-1/2” sch 40, pneumaticequipment system86 2-1/2” unassigned Lower reactor compartment,87 2-1/2” unassigned Lower reactor compartment,Close on highcontainment pressureLower reactor compartment,port aftLower reactor compartment,port aftport fwdstbd aft88 1-1/2” unassigned Space penetration Cupola head, port fwd89 1-1/2” unassigned Space penetration Cupola head, port aft90 2” salvage line Gate, normally closed, blindflanged91 2” salvage line Gate, normally closed, blindflanged92 2” salvage line Gate, normally closed, blindflangedCupola head, stbd fwdCupola head, stbd aftCupola head, port aftUpdated Final Safety Analysis Report - (STS-004-002)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!