22.01.2016 Views

Phase 1 Bike Plan_r

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BICYCLE MOBILITY NETWORK PRESCRIPTION<br />

On the basis of feedback gathered from the community through interviews, focus groups, and on-line<br />

tools, the planning team prioritized a low-stress rider experience and maximal separation between<br />

cyclists and cars by using off-road trail segments on stormwater easements wherever possible. Where<br />

the bike network corresponds to the street network, the planning team prioritized neighborhood<br />

streets with low trafc volumes and speeds. Where the network falls on busier roads, the team<br />

identied alternatives to the standard on-street bike lane, such as separated multi-use paths or<br />

protected cycle tracks outside of the vehicular travel lanes.<br />

On average, most individual residences in the urbanized area of Nueces and San Patricio counties are<br />

within a two to ve minute bike ride (on a neighborhood street) from some segment of the network,<br />

and the network delivers riders within ¼ mile (about a 5-minute walk) of:<br />

Ÿ 89% (158 of 178) of early education and daycare centers, grade schools (public and<br />

private) and higher education campuses<br />

Ÿ 85% (122 of 143) of parks over two acres in size<br />

Ÿ 83% (1088 of 1319) of transit stops and stations<br />

Ÿ 82% (541 of 657) of low income housing units (Section 8 or Housing Tax Credit properties)<br />

Ÿ 80% (104 of 130) of groceries, meat and sh markets, bakeries, and corner markets<br />

Ÿ 77% (186 of 242) of pools, senior centers, recreation centers, movie theaters, community<br />

pools, tness centers, museums and hotels<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!