Phase 1 Bike Plan_r
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
H1<br />
H2<br />
H3<br />
1<br />
INFRASTRUCTURE<br />
Low Cost/Rapid Implementa on<br />
<strong>Bike</strong> Boulevard<br />
<strong>Bike</strong> Boulevard as<br />
Transi onal<br />
Treatment<br />
Buffered <strong>Bike</strong><br />
Lane<br />
1<br />
2<br />
Buffered <strong>Bike</strong> Lane<br />
as Transi onal<br />
Treatment<br />
Mul -use Sidepath<br />
(one side) as<br />
Transi onal<br />
Treatment<br />
Strategic Capital Investment<br />
1-way Cycle Track<br />
(both sides)<br />
Mul -use Sidepath<br />
(one side); pink<br />
indicates side of<br />
street on which<br />
facility should be<br />
installed<br />
Off Road Mul -use<br />
Trail<br />
Specialized Treatments<br />
Mid-block crossing<br />
loca on<br />
Supplemental Specialized Treatments<br />
are listed in Table 8, page 47.<br />
NORTH<br />
37